BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and paving for a sidewalk / parking lot in Salem, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 10/24/2025 General Conditions, any clarification of Plans and Specifications needed by the Bidder shall be submitted to the City at least ten (10) days prior to the date of Bid Closing. WORK DESCRIPTION: This project entails construction of pedestrian crossings on River Road N, State Street, and Lancaster Drive NE. Work under this Contract includes construction of ADA ramps with truncated domes; sidewalk, curb, and gutter; a hardscaped median island; rapid rectangular flashing beacon systems; street lighting; high visibility crosswalk striping; and other appurtenant work. PREQUALIFICATION: Bidders are required to be prequalified by ODOT for the following work classifications: . EART - Earthwork and Drainage . ELEC - Electrical . MHA - Misc. Highway Appurtenances . TTC - Temporary Traffic Control Applications for Prequalification shall be submitted to ODOT no later than 10 days prior to the bid closing/opening date. See 00120.00 for more information. BID SECURITY: Bid security in the amount of 10 percent of the bid must accompany each bid in accordance with the Instructions to Bidders. AWARD: The City of Salem (""City"") reserves the right to reject any or all bids, to waive informalities, and to postpone the award of the contract for thirty (30) days. Reference Section 00130-Award and Execution of Contract in the 2024 General Conditions for Construction for City of Salem Federal Aid Transportation Projects. BUY AMERICA: This federally funded project is subject to the ""BUY AMERICA"" requirements. DISADVANTAGED BUSINESS ENTERPRISES (DBE): This project is subject to Disadvantaged Business Enterprise (DBE) program requirements and the DBE policy statement as cited in 49 CFR 26. See the DBE Commitment Requirements, ODOT Policy Statement DBE Program, DBE Information page, the DBE Supplemental Required Contract Provisions and related forms for additional information. . The DBE goal percentage for this project is 9% by ODOT. TECHNICAL QUESTIONS: Inquiries concerning the contents of the bid specifications should be directed to Elizabeth Thorley, Project Manager, at 503-588-6211 or ethorley@cityofsalem.net. GENERAL QUESTIONS: Information pertaining to this Project may be obtained from Elizabeth Thorley, PE, Project Manager, 1457 23rd Street SE, Salem OR 97302 or 503-588-6211.Shawna Self, CPPB Contracts and Procurement Manager *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$577,843.00

Public - City

Paving, Site Work

54

11

4

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
66
Bidding Soon
944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.