Published September 18, 2025 at 8:00 PM

Updated October 3, 2025

Site work and renovation of a water / sewer project in Salmon Arm, British Columbia. Completed plans call for the renovation of a water / sewer project.

The City of Salmon Arm's Water Pollution Control Centre (WPCC) is a Biological Nutrient Removal (BNR) facility with tertiary treatment, classified as a Level IV wastewater treatment plant. Originally constructed in 1975, the WPCC has undergone various upgrades over the years to improve capacity and performance. The plant currently has treatment capacity to serve up to 15,000 population equivalents (PE), which corresponds to an annual average day flow (AADF) of approximately 4,875 m3/d based on historical flow data. However, with the City's growing population and increasing wastewater demands, the facility is approaching its capacity limits. Additionally, much of the WPCC's infrastructure and equipment, particularly within its secondary treatment processes, have reached the end of their operational lifespan and require replacement to ensure future effluent standards are met and treatment efficiency is maintained. The WPCC is located at 121 Narcisse Street N.W., Salmon Arm, BC V1E 1W3. The Stage IV Upgrades project will focus on expanding and modernizing the City's wastewater treatment infrastructure to accommodate future population growth and meet increasingly stringent environmental standards. The project aims to increase the plant's capacity from its current limit of 15,000 PE, preparing the facility for anticipated service demands over the coming years. To achieve this, the upgrades will replace or augment critical components of the treatment process, improve operational efficiency, and ensure regulatory compliance with effluent discharge standards. A key element of the Stage IV Upgrades project is construction and integration of a new secondary treatment process to replace the WPCC's existing fixed growth reactors (FGRs). Another central objective of the Stage IV Upgrades project is to maximize the reuse of existing infrastructure through the upgrades. Much of the WPCC's infrastructure, including concrete tanks, pipes, and certain treatment components, may have the potential to be rehabilitated and integrated into the upgraded treatment process. By prioritizing reuse, the City aims to extend the useful life of these assets, reduce overall project costs, and minimize the environmental impact associated with new construction. To support this goal, the City selected Brown and Caldwell to evaluate existing infrastructure's condition and suitability for incorporation into the planned upgrades. This approach not only aligns with the City's commitment to fiscal responsibility but also supports a resource-efficient design that reflects the City's commitment to sustainable municipal development

Post-Bid

Water / Sewer

$70,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
3
Bidding Soon
264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

March 1, 2028

Project location map

121 Narcisse St NW, Salmon Arm, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.