BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

Site work and paving for a mixed-use development in Bluffton, Indiana. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

** As of January 29, 2025, project was awarded to Brooks Construction, awarded amount is $ 411,392.00. ** The City of Bluffton intends to resurface two basketball courts and make parking lot improvements at Roush Park. The work includes, but not limited to, basketball court resurfacing, concrete sidewalk construction, removal/ milling of asphalt pavement, asphalt surfacing, and site restoration as specified in the Contract Documents. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over the project shall apply to the project throughout. No bid shall be withdrawn after the bid opening date without the consent of the City for a period of thirty days. The City of Bluffton, Indiana reserves the right to reject all bids, waive defects and amend the Project's scope. The Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to construct the project. Based on preliminary information provided to us, it is desired to evaluate the existing pavement thicknesses and characterize the underlying subsurface soil conditions. The information provided in this report will be used by ERI and the owner in remediating the existing pavement and/or preparing civil-related plans. WORK INCLUDES: A. Removal of trees and plantings. B. Stripping topsoil. C. Protection of existing structures. A. Site earthwork as shown on the Site Plans within the project limits. B. Excavation and Backfill for site utilities. A. Asphalt paving for parking lots. B. Asphalt paving for driveways. A. Concrete paving for sidewalk. B. Sealants for construction joints. C. Sealants for expansion joints. A. Underground utility piping as identified on the site plans. B. Storm sewer piping materials. C. Water Main piping materials. D. Materials shall be neatly stored on site. Excavated material shall be neatly stockpiled if not immediately removed from the site. Streets, driveways, and sidewalks shall be kept clear and open. A. Storm drainage 5' outside building structures as shown on the Site Plans. B. Subdrainage.

Award

Sidewalks / Parking Lot

$411,392.00

Public - City

Paving, Site Work

11

11

20

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
167
Bidding Soon
1,706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

July 7, 2025

Project location map

To Be Determined, Bluffton, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.