Site work and paving for a bridge / tunnel in Versailles, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of January 15, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The proposed work includes the construction of a 87"-6" long, single span, W36x170 Steel 1-Girder bridge at 0 degree skew and 0% grade, located on Hopewell Road, over Burris Fork in Morgan County MO Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rates) and Missouri Department of Labor and Industrial Relations (State Wage Rates), whichever is higher. The Morgan County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The contract, if awarded, will be awarded to the lowest, responsive, responsible bidder complying with the Conditions of the Contract Documents within the Owner's budget, The Bidder to whom the awards are made will be notified at the earliest possible date. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest. Doc Notes: Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies, Inc. Any questions regarding the project, plans, specifications, or bid documents should be directed to Aaron McVicker of McClure, at 660-415-4007. $ 121.38Printed set of Bid Documents $ 54.68Download PDF Files $ 54.68Burn PDFs to CD-ROM Work zone traffic management shall be in accordance with applicable portions of Division 100 and Division 600 of the Standard Specifications, and specifically as follows. The project is within the known range of the federally endangered bats. These bats are known to roost in trees when not in winter hibernation. To avoid potential negative impacts to protected bats, removal of trees will only be allowed between November 1 and March 31. Temporary erosion control measures shall be provided for this project as shown on the plans in general conformance with Section 806 of the Standard Specifications to meet, as a minimum, the following requirements for the duration of this project. The contractor shall comply with all laws pertaining to the Americans with Disabilities Act (ADA) during construction of pedestrian facilities on public rights of way for this project. An ADA Checklist is provided herein to be utilized by the contractor for verifying compliance with the ADA law. The contractor is expected to familiarize himself with the plans involving pedestrian facilities and the ADA Post Construction Checklist prior to performing the work. . If the final payment documents are not completed and ready for final payment in accordance with Sec 109.8, within 60 calendar days of final acceptance of the project, the Contractor shall pay to the Contracting Authority the amount of $700 as liquidated damages and as a penalty for each Calendar Day until the final payment documents are completed and ready for final payment. The amount of liquidated damages shall be deducted from any payments due or to become due to the Contractor. Final payment documentation shall include but not be limited to the following: (a) An affidavit, on the form prescribed by the Contracting Authority, to the effect that all payments have been made and all claims have been released for all material, labor and other items covered by the contract bond. (b) A Certification, on the form prescribed by the Contracting Authority, showing the actual final DBE participation on the project including name of DBE, type of work and amount paid to each DBE firm. (c) An affidavit, on the form prescribed by the Contracting Authority , to the effect that all workers have been paid in compliance with prevailing wage requirements within the contract. This work shall consist of the dry process of adding ground tire rubber (GTR) to modify bituminous material to be used in highway construction. Existing GTR requirements in Section 1015 pertain to the wet process method of GTR modification that blends GTR with the asphalt binder (terminal blending or blending at HMA plant). The following requirements shall govern for dry process GTR modification. The dry process method adds GTR as a fine aggregate or mineral filler during mix production. All GTR modified asphalt mixtures shall be in accordance.

Award

Bridges / Tunnels

$582,495.00

Public - County

Paving, Site Work

26

10

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
42
Bidding Soon
504
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

Hopewell Rd, Versailles, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.