BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated January 29, 2025

Site work and paving for a bridge / tunnel in Greenwood, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

construction of 0.152 miles of BOX CULVERT & APPROACHES on the COUNTY ROAD NO. 545 being known as State Aid Program (SAP) Project in Leflore County Mississippi. Certified check or bid bond for five percent (5%) of the total bid, made payable to Leflore County and the State of Mississippi must accompany each proposal. Contract Time: 60 Working Days The award, if made, will be made to the lowest qualified bidder on the basis of published quantities. The Board of Supervisors hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement; minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award. PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS ROADWAY ITEMS: QUANTITY UNIT MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS 2 REMOVAL OF BRIDGE @ STA. 229.67 1.000 UN UNCLASSIFIED EXCAVATION (FM) 433.000 CY BORROW EXCAVATION (F.M.E.) (CONTRACTOR FURNISHED) (CLASS 9) 2,115.000 CY CHANNEL EXCAVATION (FM) 210.000 CY STRUCTURE EXCAVATION TEMPORARY STREAM DIVERSION 400.000 CY 1.000 EA GRANULAR MATERIAL (LVM), (CLASS 4, GROUP "B") 137.000 CY CRUSHED STONE(SIZE 610) 838.000 ton CRUSHED STONE (SIZE 57) 210.000 ton PORTLAND CEMENT 842.000 CWT SOIL-CEMENT-WATER MIXING, MULTIPLE PASS MIXERS 2,489.000 SY HOT MIX ASPHALT, ST, 12.5MM 300.000 ton CLASS "B" STRUCTURAL CONCRETE 139.850 CY REINFORCING STEEL 28,911.000 LB 18" REINFORCED CONCRETE PIPE, CLASS III ROADWAY CONSTRUCTION SURVEYING 80.000 LF 1.000 LS RIGHT-OF-WAY MARKERS (TYPE II) 16.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF 4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE) (90 MILS) 0.304 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (120 MILS) 0.152 MI TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS 10.000 NOTICE TO CONTRACTORS: CONTRACT TIME: 60 Working Day

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

Paving, Site Work

30

8

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
12
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

February 26, 2025

Project location map

COUNTY ROAD 545, Greenwood, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.