EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 11, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Garden City, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Invitation to Bid Roadway and ADA Improvements Phase 1 - Pipe Work Project Location: Boise, Idaho Question Submission Deadline:January 6, 2025, 12:00pm All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the eProcurement Portal. Contact Information Mike Fagerness Procurement & Contracting Administrator 3775 N Adams St Garden City, ID 83714 Email: mfagerness@achdidaho.org Phone: (208) 387-6316 Question Response Deadline:January 7, 2025, 4:30pm ACHD will conduct the bid openings scheduled for that date and time individually and in an order established solely by ACHD that best suits its business needs. All work involving irrigation and/or bridge work shall be completed no later than March 15, 2025, unless otherwise approved by the irrigation district. All other work shall be completed in its entirety on or before March 31, 2025. The completion dates are predicated on the intent of ACHD to issue a Notice to Proceed to the Contractor on or about January 27, 2025. ACHD shall be entitled to Liquidated Damages of $1,000.00 for each calendar day of delay in the completion of the work. A delay on one portion of the project does not justify delays on other portions of the project. All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the eProcurement Portal. All questions or clarifications must be submitted by 12:00 pm on Monday, January 6, 2025. Question Response Deadline: January 7, 2025, 4:30pm Any interpretation that may alter or change the ITB will be in writing, in the form of Addenda, which will be furnished via the eProcurement Portal. It is the Bidder's responsibility to check for Addenda before submitting bids. Proposals must be accompanied by an original or photocopy or electronic version, e.g. PDF, FAX, etc. of certified check, cashier's check, or a bid bond (collectively referred to hereafter as "Bid Security") issued by a surety authorized to issue such bonds in the State of Idaho, in an amount of ten percent (10%) of the total amount of the proposal submitted. The apparent low-cost responsive Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the contract and supply the necessary insurance documents as prescribed in the ITB. The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Award of a contract pursuant to this invitation may be delayed, without penalty, for up to sixty (60) calendar days after the date of bid. Expected Contract Bonding Requirement: $300,000.00

Award

Roads / Highways

$209,005.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
254
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

January 27, 2025

img_map_placeholder

Multiple Locations, Garden City, ID

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Roadway and ADA Improvements Phase 1 - Pipe Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.