Published January 24, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a educational facility.

Performance Period: 330 Continuous Calendar Days Liquidated Damages: Five Hundred ($500) Dollars per Continuous Calendar Day and as set forth in the Construction Questions Regarding the Current Pla Should Be Directed to Mayra Lopez, Director of Labor Law, at Email: Mlopez8@nycsca.org or Telephone Number: (718)472-8496. Range: 500001-750000 The SCA has determined that the work under this solicitation involves Electrical Work. All proposed "Wicks" trade subcontractors must be prequalified by the SCA. However, said firm must not be "disqualified", "suspended", or "ineligible", at the time of Bid Opening. Therefore, the Bidder must include with its bid, and in accordance with the Information for Bidders Section, the name of its proposed "Wicks" trade subcontractor and estimate for the trade listed in the previous sentence. The Bidder must complete and submit with its bid the "Wicks" Subcontractor Request Form. (Appendix G). If the Bidder intends to perform the "Wicks" trade work with its own forces, it must include with its bid, in accordance with the Information for Bidders Section, its name, the trade(s) and an estimate for the trade(s). Bidders intending to perform electrical or plumbing work with their own forces must be properly licensed to perform this work in the CITY OF NEW YORK. If a bidder intends to perform HVAC work with its own forces, it must furnish, upon the SCA's request, evidence satisfactory to the SCA that it possesses the technical capability to perform the HVAC work in accordance with the Contract Documents. Pursuant to the provisions of the Project Labor Agreement (PLA), dated August 25, 2020, Mentor or Graduate Mentor firms may elect or decline to perform their projects under the PLA. However, pursuant to current SCA Guidelines, if the Contractor's Bid Amount is over Three Million ($3,000,000) Dollars, then the Contractor and its Subcontractors of any tier performing Work will abide by the provisions of the PLA, and will have agreed to become signatory to, and to be bound by, via execution of the PLA Letter of Assent. A Mentor or Graduate Mentor Prime Contractor who is a signatory to a collective bargaining agreement with a participating PLA union shall be subject to the PLA. The Bidder is required to execute a PLA Letter of Assent (in the form of Appendix L to the Construction Contract) pursuant to which it agrees to become signatory to, and abide by, the provisions of the PLA. This PLA Letter of Assent will be issued at the time of the Notice of Intent to Award letter. The Bidder must sign and return this document to the SCA along with the required Construction Performance and Labor and Material Payment Bonds. Failure to submit this PLA Letter of Assent will render the Bidder to be non-responsive and therefore ineligible for award of a contract under this solicitation. Question Deadline 01/03/2025 All questions by prospective bidders concerning this solicitation should be directed to rfimentor@nycsca.org, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date using the project solicitation number in the subject line as indicated in the following example: RFIMentor 25-12345D-1 Smith and Jones Construction. Please send all Questions to rfimentor@nycsca.org, however, if you have any additional questions or issues please contact Ms. Zaneta Jackman, at E-mail: zjackman@nycsca.org, or at Phone Number: (718)472-8189. All questions by prospective bidders concerning this solicitation should be directed to rfimentor@nycsca.org, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date using the project solicitation number in the subject line as indicated in the following example: RFIMentor 25-12345D-1 Smith and Jones Construction. Please send all Questions to rfimentor@nycsca.org, however, if you have any additional questions or issues please contact Ms. Zaneta Jackman, at E-mail: zjackman@nycsca.org, or at Phone Number: (718)472-8189. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$448,000.00

Public - City

Renovation

24

12

5

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Air Barriers, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Manufactured Exterior Specialties, Window Wells
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
580
Active Projects
302
Bidding Soon
5,218
All Active Projects
2,465
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

February 7, 2025

img_map_placeholder

757 Cauldwell Ave, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

IPDVS Camera Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.