Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 13, 2024 at 7:00 PM
Updated December 14, 2024
Site work for a water / sewer project in Santa Rosa, California. Design plans call for site work for a water / sewer project.
This information is for Phase 3 of a planned 3- phase project. Project limits are from Boron Avenue downstream to Dutton Meadow. This restoration project will restore 2,450 lineal feet of straightened and denuded channel into a natural creek while still providing flood protection. The new alignment will allow the creek channel to have greater water retention during high demands. There will be structures and pools installed to enhance aquatic life such as boulders, boulder weirs, and over 1,000 native trees, shrubs, and grasses. Human elements include the creation of a Eliminate the constrictions in the existing sewer pipe across Santa Rosa Creek between manhole 12 and manhole 13. The existing 18 in ACP sewer was installed in 1969 under the creek and west of the Fulton Road bridge. The 18 in ACP sewer was lined with a 14 in polyethylene (PE) liner in 1985. CCTV video indicates that the PE liner is deformed creating constrictions. Open-cut replacement with a new 8 in diameter pipe was the method recommended by the consultants RMC/Woodward & Curran in their Technical Memorandum dated February 26, 2018. A cofferdam, fish relocation and construction area creek flow bypass will likely be necessary./pedestrian path and pedestrian bridge. This project is included in the City of Santa Rosa's FY 2025-2029 Capital Improvement Program (CIP). Per the owner, as of December 13, 2024, a design team has been selected. Owner states that the project is in the process of obtaining the necessary easements and completing the design. Owner states that they hope to advertise for bids in spring of 2025 for construction in the summer of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$400,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
Fulton Pl, Santa Rosa, CA
Related To This Project
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Dec 19 2024
Santa Rosa, CA
Bid Date: Dec 20 2024
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Feb 06 2025
Santa Rosa, CA
Bid Date: Dec 20 2024
Santa Rosa, CA
Bid Date: Jan 14 2025
Santa Rosa, CA
Bid Date: Jan 14 2025
Santa Rosa, CA
Bid Date: Jan 14 2025
Santa Rosa, CA
Bid Date: Jan 14 2025
Santa Rosa, CA
Bid Date: Dec 19 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
