BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Santa Rosa, California. Design plans call for site work for a water / sewer project.

This information is for Phase 3 of a planned 3- phase project. Project limits are from Boron Avenue downstream to Dutton Meadow. This restoration project will restore 2,450 lineal feet of straightened and denuded channel into a natural creek while still providing flood protection. The new alignment will allow the creek channel to have greater water retention during high demands. There will be structures and pools installed to enhance aquatic life such as boulders, boulder weirs, and over 1,000 native trees, shrubs, and grasses. Human elements include the creation of a Eliminate the constrictions in the existing sewer pipe across Santa Rosa Creek between manhole 12 and manhole 13. The existing 18 in ACP sewer was installed in 1969 under the creek and west of the Fulton Road bridge. The 18 in ACP sewer was lined with a 14 in polyethylene (PE) liner in 1985. CCTV video indicates that the PE liner is deformed creating constrictions. Open-cut replacement with a new 8 in diameter pipe was the method recommended by the consultants RMC/Woodward & Curran in their Technical Memorandum dated February 26, 2018. A cofferdam, fish relocation and construction area creek flow bypass will likely be necessary./pedestrian path and pedestrian bridge. This project is included in the City of Santa Rosa's FY 2025-2029 Capital Improvement Program (CIP). Per the owner, as of December 13, 2024, a design team has been selected. Owner states that the project is in the process of obtaining the necessary easements and completing the design. Owner states that they hope to advertise for bids in spring of 2025 for construction in the summer of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
39
Bidding Soon
1,226
All Active Projects
457
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

Fulton Pl, Santa Rosa, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.