BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Mississauga, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000283627 Question Acceptance Deadline 24-Jan-2025 01:30:00 PM EST Bid Intent Deadline 24-Jan-2025 12:00:00 PM EST Cont 2024-2014/GWP 2067-17-00: Hwy 403 EB and WB Lanes from Central Parkway to West of Winston Churchill Blvd in Mississauga, work to include pavement rehabilitation for 10.5 Km, Mavis Road and other interchange ramps (mill/pave), structural culverts (7) rehabilitation, non-structural culverts (4) replacement, highway high mast poles retrofitting to LED, ATMS improvements and Glen Erin Dr bridge rehabilitation. 2024-Y-0446 CA Services for Construction Contract 2024-2014. This high complexity assignment is for Hwy 403 Eastbound and Westbound lanes for 10.5Km including interchange ramps at Winston Churchill Blvd, Erin Mills Parkway, Mavis Road and Hurontario Street; all located in Mississauga.This section of freeway is high trafficked, high volume urban section with AADT of nearly 200,000 vehicles. The scope includes pavement rehabilitation, structural box culvert rehabilitation (7) by concrete patch repairs to barrel and walls/roof, non-structural drainage culvert (4) replacement at interchange ramps, electrical retroffiting for exisitng high mast illumination poles to LED type luminaires, replacement of underpass and conventional ramp luminaires to LED type, ATMS camera site and access pad modifications and bridge rehabilitation at Glen Erin Drive. Bridge rehabilitation scope includes removing and replacing expansion joint assemblies and bridge barrier wall, modification and widening of exisitng structural sidewalks for Multi-use Path conversion, bridge deck and substructure concrete patch repairs to deteriorated areas and deck waterproofing membrane replacement. Illumination hydro cable relocation and protection of exisitng plant during bridge rehabilitation is also included. Hwy 403 mainline pavement rehabilitation generally consist of mill/remove 90mm pavement and hot mix paving of 140mm (2 underlayers of binder course plus surface course SMA mix) for effective profile grade raise of 50mm.This grade raise is to be matched to exisitng edge of shoulder features such as median concrete barrier and guiderail where exisitng. Mill/pave work is required to maintain positive drainage of all lanes/shoulders at all times. Interchange ramps generally include resurfacing by hot mix paving. Mavis Road within CAH limits include 90mm pavement removal and hot mix paving. NITS detection installation at signalized intersection is also in the scope at 2 interchanges. The pavement rehabilitation work is to occure during evening/night time/weekend shifts and off-peak times as permitted by lane closure time windows specified. Bridge rehabilitation at Glen Erin Dr is scoped in 3 total traffic stages thereby maintaining one lane of traffic in each direction in each of the stages. Road occupancy permits or permission to enter may be required for box culvert access off of municipal roads/side streets outside of MTO Right-Of-Way. Structural culverts are: Glen Erin Brook culvert, Cooksville Creek culverts at Hurontario Street, east of Mavis Road and Central Parkway, Chappell Creek culvert, Mary Fix Creek culvert and Wolfdale Creek culvert. The project is classified as Group C under Provincial Class Environmental Assessment with Environmental Screening Document prepared and included for CA services. Major stakeholders requiring routine liaison and communication are City, Region, Transit agencies, Emergency Services,utility owners etc. 4 structural culverts have in-water work timing window permitted from July 1 to March 31 due to direct or indirect fisheries habitat. Official bid documents must be obtained from www.raqsesp.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
124
Bidding Soon
2,486
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

img_map_placeholder

ON-403, Mississauga, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.