BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Renovation of a library in Portola, California. Working plans call for the renovation of a library.

*As of February 14, 2025, the bids have all been rejected and the project will rebid at a later date* The Plumas County Department of Facility Services and Airports is responsible for maintaining several County owned buildings and Properties throughout Plumas County. This includes, but is not limited to, routine maintenance, HVAC repair, plumbing, electrical, yard maintenance, and Capital Improvement Projects. The purpose for this Invitation for Bid is to seek and enter into a contract with a Contractor that holds a California Contractors License C-15 Flooring and Floor Covering Contractors issued by the state of California, to supply materials and labor to replace Approx 556 Square Feet of flooring in entry and two restrooms at Portola Library at 34 3rd Ave Portola Ca 96122 Entry Flooring to be Tarkett VCT II 530 Winter Storm WG Wall Base to be Tarkett Baseworks TSB 282 Vaporize 4in with toe Restroom Flooring to be Tarkett LinoFloor XF2 Horizon 663 Contractor to verify Quantities Needed Date: 02/04/2025 Recommendation of Award presented to Board of Supervisors for approval. Date: 02/04/2025 Contract start date, pending approval by Board of Supervisors Question Deadline 01/27/2025 at 4:00 PM PT Please refer all questions to: Nick Collin nickcollin@countyofplumas.com (530) 283-6069 -Submit proposals to 198 Andy's Way, Quincy, Ca, 95971 Services to be provided by the contractor to the Plumas County Facility Services and Airports, and the amounts of the services, shall be as follows: 1. The Contractor shall a. Provide all materials and labor b. Remove existing and properly dispose of existing flooring c. Prep areas for new flooring d. Layout and glue down new VCT flooring in entrance and install wall base e. Install new linoleum in restrooms and cove Linoleum at walls. f. Provide and install transitions g. Clean up and remove all unused material and waste from project h. All work to be done in a safe and workmanlike manner to industry standards i. All work will comply with the California Building and all applicable state and federal laws and regulations Entry Flooring to be Tarkett VCT II 530 Winter Storm WG Wall Base to be Tarkett Baseworks TSB 282 Vaporize 4in with toe Restroom Flooring to be Tarkett LinoFloor XF2 Horizon 663

Final Planning

Library

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
52
Bidding Soon
473
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

August 20, 2025

Project location map

34 3rd Ave, Portola, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.