BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work and paving for a sidewalk / parking lot in Wheaton, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The City of Wheaton is soliciting competitive bids for the 2025 Fall New Sidewalk Program. PROJECT SCHEDULE Completion Date: November 21, 2025 SCOPE OF WORK This project includes PCC sidewalk installation, sidewalk removal, topsoil furnish & place, sodding, parkway restoration, concrete curb and gutter, ADA curb ramps, driveway apron removal and replacement, tree removal, and all incidental, appurtenant, and collateral work therefore (collectively the project) necessary to complete the project within the project limits. See attached technical specifications and drawings. Full size drawings have been uploaded as a separate document. All questions, either administrative or technical, shall be submitted via email to Tony Sperkowski at asperkowski@wheaton.il.us no later than September 17, 2025, at 11:00 am (CST). All questions, clarifications or revisions regarding this bid will be issued via a written addendum and published on the City's website. Each Vendor shall acknowledge receipt of any addenda on the Cost Proposal form. Each Vendor, by acknowledging receipt of any addenda, is responsible for the content of the addenda and any changes to the bid. Failure to acknowledge issued addenda may cause the bid submittal to be rejected BONDS Bid Bond: A Bid Bond/Bid Deposit of 10% of the full contract price is required with your bid submittal. Payment Bond: The successful Bidder shall provide an original Payment Bond equal to one hundred ten percent (100%) of the full amount of the award. Performance Bond: The successful Bidder shall provide an original Performance Bond equal to one hundred ten percent (100%) of the full amount of the award. Maintenance Bond: The successful Bidder shall be required to furnish a Maintenance Bond equal to ten percent (10%) of the final contract price for the faithful performance of the Bidder's obligation to maintain and keep in good repair, the work herein contracted to be done and performed for one (1) year from the date of final acceptance by the City. The cost of said bonds shall be included in the total bid amount.

Award

Sidewalks / Parking Lot

$916,378.00

Public - City

Paving, Site Work

21

5

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
244
Bidding Soon
3,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

October 15, 2025

Project location map

Multiple Locations, Wheaton, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.