Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Site work and new construction of an educational facility in Lexington, Kentucky. Completed plans call for site work for a educational facility; and for the construction of a 87,352-square-foot educational facility.
This is the second phase of a two-phase project. Phase 1, already under construction, includes earthwork, storm drainage, erosion control, new site utilities, demolition of existing site utilities, general requirements and LEED requirements for early work, concrete foundations, slab-on-grade, and structural steel framing. The Phase 2 Work consists of, but is not limited to, the following: Construction of a new four-story, 87,352 gross square foot facility on the Bluegrass Community and Technical College Newtown Campus in Lexington, Kentucky. • Primary building systems consist of: o Brick veneer over cold-formed metal stud exterior walls for Levels 01–03; o Formed metal panel over cold-formed metal stud exterior walls at Level 04; o A two-ply SBS modified bitumen roof system; o Geothermal water-source heat pumps with a dedicated outdoor air unit (DOAS) located within the building. • Vertical circulation includes three egress stairwells and two machine room-less traction elevators providing access to all four floors. • Interior finishes include but are not limited to: o Gypsum board walls; o Solid surface countertops; o Plastic laminate casework; o Resilient floor tile and carpet tile. • Select areas will feature upgraded finishes, including: o Terrazzo flooring; o Wood veneer-clad departmental entryways and reception desks with integrated textile elements; o A three-tiered social stair with tongue and groove wood plank flooring. • The project is targeting LEED BD+C v4 Silver certification (minimum 50 points), with selected credits pursued under the LEED BD+C v4.1 compliance paths. A bid security in the form of a Bid Bond or Certified Check for five percent (5%) of the bid amount including all alternates is required to be submitted with the official form of proposal. The bid security shall be made to Trace Creek Construction, Inc. A 100% performance and payment bond shall be provided for the full base bid amount plus any accepted bid alternate(s), upon receipt of a Notice of Award. Trace Creek Construction, Inc. reserves the right to accept and/or reject any bid deemed to be in the best interest of Trace Creek Construction, Inc. and the Kentucky Community and Technical College System in accordance with the laws of the Commonwealth of Kentucky. The following shall be the official contact list for the project. All communication and clarification concerning the bidding documents shall be forwarded through the contacts listed below. All correspondence and questions shall be copied to the Construction Managers and the Architects office by email: Construction Manager: Trace Creek Construction, Inc. Steve Hatfield, Project Manager Cell: (859) 585-3123 Email: shatfield@tracecreek.net Architect: Omni Architects Teddi Hibberd, Senior Associate Office: (859) 252-6664 Email: teddi@omniarchitects.com
GC Bidding
Educational
$50,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
February 11, 2026
500 Newtown Pike, Lexington, KY
Related To This Project
Lexington, KY
--
Lexington, KY
Bid Date: Jan 22 2025
Lexington, KY
Bid Date: Jan 16 2025
Lexington, KY
Bid Date: Feb 04 2025
Lexington, KY
Bid Date: Jan 29 2025
Lexington, KY
Bid Date: Jan 29 2025
Lexington, KY
Bid Date: Jan 17 2025
Lexington, KY
Bid Date: Dec 16 2024
Lexington, KY
Bid Date: Jan 08 2025
Lexington, KY
Bid Date: Jan 16 2025
Lexington, KY
Bid Date: Jan 09 2025
Lexington, KY
Bid Date: Mar 22 2019
Lexington, KY
Bid Date: Jul 16 2019
Lexington, KY
Bid Date: Dec 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
