BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and new construction of a fire / police facility in Bedford, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Construction began May 15, 2025, and is expected to be complete November 30, 2026. Project The Town of Bedford is seeking statements of qualifications from Elevator sub-bidders for the construction of the new Bedford Fire Station Headquarters. The work consists of construction of a 2 story fire station headquarters. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. No site visit will be held Construction of a 2 story Fire Headquarters, training room, administrative offices, bunk rooms, break-areas & kitchens, totaling approximately 25,000 square feet. As well as a single-story Accessory Structure approximately 2,400 square feet. The Work includes site work, landscaping, site improvements, concrete, cast in place concrete, unit masonry, structural steel, metal deck, decorative metal railings, metal fabrications, insulated wood sheathing, siding and trim, miscellaneous carpentry, exterior finish carpentry, interior architectural woodwork, sheet waterproofing, thermal insulation, air and vapor barriers, joint sealants, firestopping systems, roof accessories, sheet metal, asphalt shingle roofing, single ply membrane roofing; hollow metal doors and frames, wood doors, four-fold doors, overhead sectional doors, fiberglass windows, door hardware, glazing, aluminum louvers; gypsum board assemblies, miscellaneous interior finishes, ceramic tile, acoustical panel ceiling systems, painting, resilient athletic flooring assemblies, carpet and carpet tile. Miscellaneous specialties including visual display boards, metal lockers, specialty metal lockers, impact resistant wall protection, signage, fire extinguishers, toilet partitions & accessories, residential appliances, miscellaneous equipment, roller shades, horizontal louver blinds, plumbing, fire protection, passenger elevator, heating ventilating-air conditioning; electrical systems, and lighting.

Under Construction

Fire / Police

$23,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
3
Bidding Soon
2,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2024

May 15, 2025

Project location map

139 Great Rd, Bedford, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.