Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work and new construction of a fire / police facility in Bedford, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
Construction began May 15, 2025, and is expected to be complete November 30, 2026. Project The Town of Bedford is seeking statements of qualifications from Elevator sub-bidders for the construction of the new Bedford Fire Station Headquarters. The work consists of construction of a 2 story fire station headquarters. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. No site visit will be held Construction of a 2 story Fire Headquarters, training room, administrative offices, bunk rooms, break-areas & kitchens, totaling approximately 25,000 square feet. As well as a single-story Accessory Structure approximately 2,400 square feet. The Work includes site work, landscaping, site improvements, concrete, cast in place concrete, unit masonry, structural steel, metal deck, decorative metal railings, metal fabrications, insulated wood sheathing, siding and trim, miscellaneous carpentry, exterior finish carpentry, interior architectural woodwork, sheet waterproofing, thermal insulation, air and vapor barriers, joint sealants, firestopping systems, roof accessories, sheet metal, asphalt shingle roofing, single ply membrane roofing; hollow metal doors and frames, wood doors, four-fold doors, overhead sectional doors, fiberglass windows, door hardware, glazing, aluminum louvers; gypsum board assemblies, miscellaneous interior finishes, ceramic tile, acoustical panel ceiling systems, painting, resilient athletic flooring assemblies, carpet and carpet tile. Miscellaneous specialties including visual display boards, metal lockers, specialty metal lockers, impact resistant wall protection, signage, fire extinguishers, toilet partitions & accessories, residential appliances, miscellaneous equipment, roller shades, horizontal louver blinds, plumbing, fire protection, passenger elevator, heating ventilating-air conditioning; electrical systems, and lighting.
Under Construction
Fire / Police
$23,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 26, 2024
May 15, 2025
139 Great Rd, Bedford, MA
Related To This Project
Bedford, MA
Bid Date: Jan 14 2025
Bedford, MA
Bid Date: Jan 30 2025
Bedford, MA
Bid Date: Jan 23 2025
Bedford, MA
Bid Date: Feb 04 2025
Bedford, MA
Bid Date: Jan 17 2025
Bedford, MA
Bid Date: Feb 11 2025
Bedford, MA
Bid Date: Feb 11 2025
Bedford, MA
Bid Date: Jan 30 2025
Bedford, MA
Bid Date: Oct 06 2021
Bedford, MA
--
Bedford, MA
--
Bedford, MA
Bid Date: Jan 07 2025
Bedford, MA
Bid Date: Feb 20 2025
Bedford, MA
Bid Date: Nov 27 2024
Bedford, MA
Bid Date: Jan 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
