BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Bedford, Massachusetts. Working plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Project The Town of Bedford is seeking statements of qualifications from Elevator sub-bidders for the construction of the new Bedford Fire Station Headquarters. The work consists of construction of a 2 story fire station headquarters. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. No site visit will be held Construction of a 2 story Fire Headquarters, training room, administrative offices, bunk rooms, break-areas & kitchens, totaling approximately 25,000 square feet. As well as a single-story Accessory Structure approximately 2,400 square feet. The Work includes site work, landscaping, site improvements, concrete, cast in place concrete, unit masonry, structural steel, metal deck, decorative metal railings, metal fabrications, insulated wood sheathing, siding and trim, miscellaneous carpentry, exterior finish carpentry, interior architectural woodwork, sheet waterproofing, thermal insulation, air and vapor barriers, joint sealants, firestopping systems, roof accessories, sheet metal, asphalt shingle roofing, single ply membrane roofing; hollow metal doors and frames, wood doors, four-fold doors, overhead sectional doors, fiberglass windows, door hardware, glazing, aluminum louvers; gypsum board assemblies, miscellaneous interior finishes, ceramic tile, acoustical panel ceiling systems, painting, resilient athletic flooring assemblies, carpet and carpet tile. Miscellaneous specialties including visual display boards, metal lockers, specialty metal lockers, impact resistant wall protection, signage, fire extinguishers, toilet partitions & accessories, residential appliances, miscellaneous equipment, roller shades, horizontal louver blinds, plumbing, fire protection, passenger elevator, heating ventilating-air conditioning; electrical systems, and lighting.

Final Planning

Fire / Police

$23,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
143
Bidding Soon
2,578
All Active Projects
993
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2024

March 3, 2025

img_map_placeholder

139 Great Rd, Bedford, MA


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.