Site work for a civil project in Fort Worth, Texas. Completed plans call for site work for a water / sewer project.

GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: A 1,600 GPM lift station with a total dynamic head of about 310 feet using submersible pumps, associated electrical improvements including new service, switchgear, motor controls, VFD's, instrumentation and SCADA equipment, standby power generator and automatic transfer switch, building to house electrical and instrumentation equipment, cast in place concrete wet well and valve vault, about 2,000 linear feet of 12-inch diameter force main and appurtenant construction including site improvements, access road, power extension, odor control, piping, valves, fencing, etc. PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre qualified by the City at the time of bid opening. CITYS RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. - 30114-0200431-105187-E07685 For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en-us Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010. To get started with Bonfire, watch this five-minute training video: Vendor Registration and Submission [VIDEO] - Bonfire Vendor Support (gobonfire.com) The major work will consist of the (approximate) following: A 1,600 GPM lift station with a total dynamic head of about 310 feet using submersible pumps, associated electrical improvements including new service, switchgear, motor controls, VFD's, instrumentation and SCADA equipment, standby power generator and automatic transfer switch, building to house electrical and instrumentation equipment, cast in place concrete wet well and valve vault, about 2,000 linear feet of 12-inch diameter force main and appurtenant construction including site improvements, access road, power extension, odor control, piping, valves, fencing, etc Business Equity Goal: 16.79% Question Deadline 02/03/2025 at 2:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be directed to City electrically through the Vendor Discussions section under the respective Project via the Procurement Portal https://fortworthtx.bonfirehub.com/opportunities on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Award

Water / Sewer

$9,289,242.00

Public - City

Site Work

69

34

28

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
175
Bidding Soon
3,679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.