Published January 24, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Watertown, Connecticut. Completed plans call for site work for a water / sewer project.

Lead Service Line Replacement Program Phase 1B The Project consists of identification and replacement of existing utility-side and customerside lead service lines throughout the City with new copper service lines, as well as restoration of the impacted properties Each Bid shall be submitted in accordance with Section 00 21 13, Instructions to Bidders, and shall be accompanied by a Bid Security in the amount of 10 percent of the Bid. Bids will be awarded to the low, responsive, and responsible/qualified bidder. Successful bidder must furnish 100 percent Performance Bond and 100 percent Payment Bond. Projects with an estimated cost greater than $100,000 are subject to minimum wage rates as per the State of Connecticut Department of Labor prevailing wage rates. Projects with an estimated cost greater than $2,000 are subject to minimum wage rates as per the federal Davis-Bacon prevailing wage laws, including reporting requirements Contractors performing work with a contract value of $1,000,000 or greater, shall hold a current DAS Contractor Prequalification Certificate from the Department of Administrative Services of the State of Connecticut according to C.G.S. 4a-100, C.G.S. 4b-101 and C.G.S. 4b-91. The same applies for Subcontractors with a subcontract value of $500,000 or more. Bidders shall submit with their bids a DAS Contractor Prequalification Certificate along with a current Update (Bid) Statement. Any bid submitted without a copy of the DAS Contractor Prequalification Certificate and an Update (Bid) Statement shall be invalid. Prior to the commencement of any portion of the Work by a Subcontractor whose subcontract value is equal to or greater than $500,000, the Contractor shall provide to the Owner a current DAS Contractor Prequalification Certificate for such Subcontractor along with an Update (Bid) Statement. Bidders do not need to include the subcontractor certificates with their bids, but must have them at the time they commence work on the Project. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the State of Connecticut Drinking Water State Revolving Fund. Neither the State of Connecticut nor any of its Departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-484-4 of the RCSA. Any contract or contracts awarded under this invitation for bids are subject to the Minority and Women's Business Enterprise (MBE/WBE) goal conditions established in the June 19, 2019 Clean Water Fund Memorandum of three and five percent, respectively. The Subcontractor Verification Form must be completed for each MBE/WBE subcontractor to be employed in the completion of this project. Bidders should know that this project is subject to PL 113-76 the Consolidated Appropriations Act, 2014, Section 436, which requires the use of iron and steel products that are wholly manufactured in the United States for inclusion in the construction of this project. The Bidder should therefore assure that its Subcontractors, suppliers, or materialmen are aware of this requirement and are prepared to provide certifications that demonstrates compliance with this law. The Bidder shall enter into and manage a project labor agreement with the City of New London (the "PLA"). Bidders shall have experience with Project Labor Agreements in the State of Connecticut. Question Deadline 01/13/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted to Issuing Office in writing

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

7

19

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Work by Owner, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Extra Stock Materials
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Communications Services, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Service Connections, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
556
Active Projects
328
Bidding Soon
4,868
All Active Projects
2,270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lead Service Line Replacement Program - Phase 1B

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.