Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Site work for a water / sewer project in Saint Augusta, Minnesota. Completed plans call for site work for a water / sewer project.
Work included in this section shall be performed in accordance with the following paragraphs, the General Requirements set forth in these Specifications, and the provisions of the other Contract Documents. St. Cloud Hydroelectric Tainter Gate Rehabilitation Project Contract 2025-06 Estimated Contract Quantities 1 Lump Sum Mobilization, 1 Lump Sum Dewatering 1 Lump Sum Tainter Gates (Sand Blast and Paint) 1 Lump Sum Demo and Replace Seals 1 Lump Sum Concrete Void Repairs 1 Lump Sum Erosion Control, Together With Appurtenant Work. General information. Bulkhead weight is approximately 9,000 lbs. 3. General information. The existing tainter gate coating has not been tested for lead. 4. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.03 C. Remove and replace last sentence. Bullet point C to read: C. River levels are controlled through the overflow spillway, powerhouse, and tainter gates. During the performance of the work, tainter gate operation will be avoided unless high flows occur and the tainter gates are needed. The Owner is responsible for managing river flows during construction and will coordinate with Contractor. 5. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.04 B 5. Remove and replace. Bullet point 5 to read: 5. Control of water. Owner will install and remove bulkheads upstream of the tainter gates. Contractor is responsible for monitoring the dewatering system and coordinating timing of installation/removal of bulkhead system with the owner. Dewatering system may leak. Contractor will need to manage the water resulting from dewatering system leakage as well as any precipitation that may occur. 6. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.04 E. Remove bullet point E. 7. Technical Specifications, Section 02 41 00 Demolition, Section 1.03 A. Remove and replace. Bullet point A to read: A. Owner to install bulkheads. Contractor is responsible for monitoring the dewatering system and coordinating timing of installation/removal of bulkhead system with the owner. Dewatering system may leak. Contractor will need to manage the water resulting from dewatering system leakage as well as any precipitation that may occur
Award
Water / Sewer
$646,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2025
March 3, 2025
To Be Determined, Saint Augusta, MN
Related To This Project
Saint Augusta, MN
Bid Date: Jan 15 2025
Saint Augusta, MN
--
Saint Augusta, MN
--
Saint Augusta, MN
Bid Date: Feb 07 2025
Saint Augusta, MN
Bid Date: Feb 28 2025
Saint Augusta, MN
Bid Date: Mar 18 2025
Saint Augusta, MN
Bid Date: Dec 09 2024
Saint Augusta, MN
Bid Date: Nov 15 2024
Saint Augusta, MN
Bid Date: Nov 29 2024
Saint Augusta, MN
--
Saint Augusta, MN
Bid Date: Oct 10 2024
Saint Augusta, MN
Bid Date: Aug 20 2024
Saint Augusta, MN
Bid Date: Sep 09 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed