BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work for a water / sewer project in Saint Augusta, Minnesota. Completed plans call for site work for a water / sewer project.

Work included in this section shall be performed in accordance with the following paragraphs, the General Requirements set forth in these Specifications, and the provisions of the other Contract Documents. St. Cloud Hydroelectric Tainter Gate Rehabilitation Project Contract 2025-06 Estimated Contract Quantities 1 Lump Sum Mobilization, 1 Lump Sum Dewatering 1 Lump Sum Tainter Gates (Sand Blast and Paint) 1 Lump Sum Demo and Replace Seals 1 Lump Sum Concrete Void Repairs 1 Lump Sum Erosion Control, Together With Appurtenant Work. General information. Bulkhead weight is approximately 9,000 lbs. 3. General information. The existing tainter gate coating has not been tested for lead. 4. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.03 C. Remove and replace last sentence. Bullet point C to read: C. River levels are controlled through the overflow spillway, powerhouse, and tainter gates. During the performance of the work, tainter gate operation will be avoided unless high flows occur and the tainter gates are needed. The Owner is responsible for managing river flows during construction and will coordinate with Contractor. 5. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.04 B 5. Remove and replace. Bullet point 5 to read: 5. Control of water. Owner will install and remove bulkheads upstream of the tainter gates. Contractor is responsible for monitoring the dewatering system and coordinating timing of installation/removal of bulkhead system with the owner. Dewatering system may leak. Contractor will need to manage the water resulting from dewatering system leakage as well as any precipitation that may occur. 6. Technical Specifications, Section 01 11 00 Summary of Work, Section 1.04 E. Remove bullet point E. 7. Technical Specifications, Section 02 41 00 Demolition, Section 1.03 A. Remove and replace. Bullet point A to read: A. Owner to install bulkheads. Contractor is responsible for monitoring the dewatering system and coordinating timing of installation/removal of bulkhead system with the owner. Dewatering system may leak. Contractor will need to manage the water resulting from dewatering system leakage as well as any precipitation that may occur

Award

Water / Sewer

$646,500.00

Public - City

Site Work

12

18

2

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
7
Bidding Soon
978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

To Be Determined, Saint Augusta, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.