BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2024 at 7:00 PM

Updated December 18, 2024

Site work for a mixed-use development in Monette, Arkansas. Completed plans call for site work for a educational facility.

Save Share Details for The Buffalo Island Central School District is accepting bids to 12 hrs ago The Buffalo Island Central School District is accepting bids to tear down 886 feet of existing commercial fencing and install heavy commercial chain link fence with one 20'double drive gate and two 4'walk gates. Post will be set in 3'deep in ground and every corner and terminal post will be braced. Spec: 3" ss40 terminal post, 4" ss40DDP, 2" ss40 line post.

Post-Bid

Educational

$60,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
62
Bidding Soon
571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

Project location map

Multiple Locations, Monette, AR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.