BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2025 at 7:00 PM

Updated January 29, 2025

Renovation of an educational facility in Dallas, Texas. Completed plans call for the renovation of a educational facility.

1. New secure vestibule to be created including rearrangement of adjacent office spaces, inclusion of new storefront, rearrangement of doors, and inclusion of infrastructure for security equipment. 2. Replace exterior waterproofing/sealant joints, including at door and wall penetrations to eliminate leaks and condensation drainage damage. 3. Replace vinyl composite tile (VCT) flooring and base at 1st and 2nd floor corridors per District Standards. 3rd floor is new and is to remain as-is. 4. Paint all previously painted interior surfaces. Repair/patch walls prior to painting (except at areas of renovation). Scope to include all areas of school. 5. Replace outdated exterior windows with new energy-efficient window assemblies. Refer to drawings for exact locations. 6. New way-finding site signage to be installed to meet DISD standards. 7. Replace damaged center mullion between gyms 123 and 124. 8. Replace mechanical room M3 door for code compliant access. Deadline for questions will be pushed to January 16th The Dallas Independent School District ("District") is soliciting Competitive Sealed Proposals ("CSP") from qualified sources relative to the provision of the following request For Competitive Sealed Proposals ("CSP"). This procurement will be managed under the Dallas ISD Construction Services department. Scope In accordance with the Texas Government Code Chapter 2269 the Dallas ISD is requesting Competitive Sealed Proposals (CSP) from general construction contractors. The following instructions by the Dallas Independent School District are intended to afford proposers an equal opportunity to participate in the proposal process. No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School District's Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. Question Deadline 01/13/2025 Question Responses from the District 01/14/2025 Total Estimated Construction Budget (CCL + IC+ Allowances) for CSP 207837 $8,594,265.00. Contact Information: Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email: ProcurementCS@dallasisd.org Final COMPLETION 60 days after Substantial

Post-Bid

Educational

$8,594,265.00

Public - City

Renovation

162

34

20

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
44
Bidding Soon
4,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

March 31, 2025

Project location map

3838 Crown Shore Dr, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.