Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2025 at 7:00 PM
Updated January 28, 2025
Site work for a playground / park / athletic field in Lowell, Massachusetts. Conceptual plans call for site work for a playground / park / athletic field.
As of January 27, 2025, an engineer has been been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Lowell National Historical Park's 1.5-mile trolley system has been in operation for 30+ years in its current form. The trolley system is a small remnant of the historic trolley system from the era of the mills at the National Historic Site. The trolley system is currently in a general state of good repair. However, portions of the trolley system are reaching their end-of-life in which critical component renewals will be needed in addition to enhanced preventative maintenance activities. The U.S. Department of Transportation (U.S. DOT), John A. Volpe National Transportation Systems Center (Volpe Center), Cambridge, MA, is conducting market research to identify small business concerns for the design of a new Wye that provides a switching area for the trolley to transit from the carbarn to either the Swamp Locks platform or to the Suffolk Platform; and allows the trolley to transit from the Swamp Locks run to the Suffolk track run for the Park's Historical Trolley System. The Contractor shall also confer with the City of Lowell Engineering Office to review and incorporate Father Morrisett Blvd redesign - the installation of the Wye shall conform to meet the City's plans for rehabilitation efforts behind the High School. Note: No As-Built drawings exist for this trolley system. So, all critical dimensions and material data must be field verified. This Sources Sought Notice does not constitute a solicitation and is not to be construed as a commitment by the Government. The Government will not pay for any effort expended in responding to this notice. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 24, 2025
246 Market St, Lowell, MA
Related To This Project
Lowell, MA
Bid Date: Dec 19 2024
Lowell, MA
--
Lowell, MA
Bid Date: Jan 08 2025
Lowell, MA
--
Lowell, MA
--
Lowell, MA
Bid Date: Feb 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
