BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Eagle Lake, Minnesota. Completed plans call for site work for a bridge / tunnel.

CR 184 Culvert Replacement and Grading County Project CP 2184 The major items of work are approximately: QTY UNIT. Description 0.12 ACRE Clearing & Grubbing 48 LF Sawing Pavement (Full Depth) 125 LF Remove Pipe Culverts 663 SY Remove Bituminous Pavement 1 LS Remove Miscellaneous Structures 394 CY Excavation Common (P) 1022 CY Common Embankment (CV) (P) 20 TON Aggregate Surfacing Class 2 205 TON Aggregate Base Class 5 60 TON Shoulder Base Aggregate Class 1 245 TON Type SP 12.5 Bituminous Mix 2 EACH Install 8x8 Precast Concrete Box Culvert End Section 110 LF Install 8x8 Precast Concrete Box Culvert 335 CY Granular Backfill (CV) (P) 165 CY Coarse Aggregate Bedding (CV) (P) 2 EACH 18" GS Pipe Apron 2 EACH 18 CAS Safety Apron 184 LF 18 CS Pipe Culvert 240 CY Random Riprap Class IV 110 CY Granular Filter 80 SY Reposition Existing Riprap 1 LS Traffic Control 1 LS Stabilized Construction Exit 50 LF Flotation Silt Curtain Type Moving Water 90 LF Sediment Control Log Type Straw 1 LS Temporary Stream Diversion System 1 LS Turf Establishment 1872 SY Rolled Erosion Prevention Category 20 5 MGAL Rapid Stabilization Method 3 The bids will be considered by the County Board of Commissioners on February 4, 2025 Bids must be accompanied by a corporate surety bond made in favor of Blue Earth County or a certified check made payable to the Blue Earth County Treasurer for 5% of the amount of the bid. Upon execution of the Contract, certified checks or bid bonds will be returned to the unsuccessful bidders within 30 days of the opening of the bids. The successful bidder will be required to furnish a Surety Bond. The Blue Earth County Board of Commissioners reserves the right to reject any or all bids or to waive defects. Award Date: 02/04/2025

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Site Work

32

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
54
Bidding Soon
760
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

March 17, 2025

img_map_placeholder

County Rd 184, Eagle Lake, MN

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.