BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2025 at 7:00 PM

Updated January 28, 2025

Site work and paving for a mixed-use development in Rapid City, South Dakota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Rosilee Lane Sanitary Sewer Replacement Document notes An Optional Paper Set of the Proposal Forms and Specifications for Individual Use May Be Obtained From the Office of the Engineer, Terrasite Design, 1635 Deadwood Avenue, Rapid City, Sd 57702, Telephone 605-791-1736, E-mail: Allison.zepp@terrasitedesign.com, Upon Payment of $100.00, None of Which is Refundable. The Project Shall Consist of the Following Work and Approximate Quantities and Kinds of Materials: Construction of 1770 Lf of Sanitary Distribution Main and Associated Sanitary Sewer Services This Will Also Include Demolition, Site Grading, Concrete Curb and Gutter, Concrete Driveways, Asphalt Paving, Temporary Gravel Surfacing, Seeding, Site Grading, Restoration of Turf and Landscape, and All Miscellaneous Appurtenant Work. All Proposals Shall Be Made on Forms Provided by the Engineer. Each Bid Must Be Accompanied by Bid Security Payable to the Owner for 10% of the Total Bid as a Bid Bond or 5% as a Certified or Bank Check. As Soon as the Bid Prices Have Been Compared, the Owner Will Return the Bond of All Except the Three Lowest, Responsive, Responsible Bidders for Each Schedule. The Bonds of the Two Remaining Unsuccessful Bidders Will Be Retained Until the Earlier of Seven Days After the Effective Date of the Agreement or 30 Days After the Bid Opening. The Bond of the Successful Bidder Will Be Retained Until the Contract and Surety Bond Have Been Executed and Approved, After Which It Will Be Returned. Bidders on This Work Will Be Required to Comply With Title 40 Cfr 33 and Executive Order 12138. The Goals and Other Requirements for Bidders and Contractors Under This Regulation Which Concerns Utilization of Minority Business Enterprises (Mbe) and Women's Business Enterprises (Wbe) Are Explained in the Specifications. The Goals and Other Requirements for Bidders and Contractors Under This Regulation Which Concerns Utilization of Minority Business Enterprises (Mbe) and Women's Business Enterprises (Wbe) Are Explained in the Specifications. The Mbe Goal for This Project is 1.5% of the Total Dollar Value of the Job While the Wbe Goal is 2.4% of the Total Dollar Value of This Job. Bidders Will Be Required to Comply With Davis Bacon Wage Rate Requirements. The Low Responsive Bidder Will Be Required to Certify to Compliance With the American Iron and Steel Provision of the Consolidated Appropriations Act of 2014. Please Be Advised That Waivers or Exemptions From the American Iron and Steel Provision That Cite International Trade Agreements Do Not Comply With the Consolidated Appropriations Act of 2014 as It Applies to the Srf Programs. Claims From Suppliers That the American Iron and Steel Provision Does Not Apply to Certain Products Based on the International Trade Agreement Exemptions of the Consolidated Appropriations Act of 2014 Will Not Be Accepted. Nondiscrimination in Employment a) Bidders on This Work Will Be Required to Comply With the President's Executive Orders Nos 11246 as Amended, 11458, 11518, and 11625. The Requirements for Bidders and Contractors Under These Orders Are Explained in the Specification B) the Goal for Female Utilization Which Shall Be Included in All Federal and Federally Assisted Construction Contracts and Subcontracts in Excess of $10,000 Shall Be 6.9%. The Goal for Minority Utilization Which Shall Be Included in All Federal and Federally Assisted Construction Contracts and Subcontracts in Excess of $10,000 Shall Be 3.4%. The Goals Are Applicable to the Contractor's Aggregate on-site Construction Workforce Whether or Not Part of That Workforce is Performing Work on a Federally and Federally Assisted Contract or Subcontract. The Low Responsive Bidder Must Assure Compliance With the Requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. Contractors Must Assure That Telecommunications Equipment Produced by Huawei Technologies Company or Zte Corporation (or Any Subsidiary or Affiliate of Such Entities), and Video Surveillance and Telecommunications Equipment Produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or Any Subsidiary or Affiliate of Such Entities) Will Not Be Supplied for the Project. Based on the "build America, Buy America" Provisions of the Infrastructure Investment and Jobs Act (Iija) and E.o. 14005 Which Provide That, as Appropriate and to the Extent Consistent With Law, a Preference Will Be Provided to Contractors for the Purchase, Acquisition, or Use of Goods, Products, or Materials Produced in the United States (Including but Not Limited to Iron, Aluminum, Steel, Cement, and Other Manufactured Products.) the Contractor Shall Provide Documentation of Their Efforts to Meet the Provisions of "build America, Buy America" Upon Request. With Submittal of a Bid, the Contractor Represents That They Have Visited the Site, Familiarized Himself With the Local Conditions Under Which the Work is to Be Performed, and Correlated His Observations With the Requirements of the Contract Documents. The Owner Reserves the Right to Reject Any and All Bids or to Accept Any Bid. Contractor's Proposals Shall Hold Firm for 30 Days From the Date of Opening.

Bid Results

Sidewalks / Parking Lot

$862,743.00

Public - City

Paving, Site Work

65

23

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
13
Bidding Soon
194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

Project location map

Rosilee Ln, Rapid City, SD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.