Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of an educational facility in Raleigh, North Carolina. Conceptual plans call for the demolition of a educational facility; for the construction of a 925,000-square-foot, 3,000-bed, 1,500-seat educational facility; and for site work for a educational facility.
This project will provide new student housing and dining facilities in multiple phases to address increased demand driven by enrollment growth and the freshman live-on-campus requirement. The project will construct about 3000 traditional and semi-suite style student beds and a new 1500-seat dining facility on Central Campus and will have a focus on sustainability. New construction is anticipated as follows: ~800,000 GSF of housing ~100,000 GSF of dining ~25,000 GSF of student life space Three existing student housing buildings, a dining facility, and a small service building at the end of their useful lives will be demolished as part of this multi-phase project. To meet financial goals the bed count must increase with each phase of development. A new dining facility will increase the seat count for allyou-care-to-eat dining, including a cafe + market, and student center activity-oriented space. The project includes a new regional utility plant, underground utility distribution, and considers rerouting a campus street. Phases anticipated: Phase 1 - construct approximately 1,500 beds Phase 2 - demolish one residence hall, West Dunn Building, and construct approximately 750 beds and the dining hall/student center space Phase 3 - demolish remaining buildings, construct approximately 750 beds Each phase of the project will target LEED Silver or better. Detailed Sustainability goals are being developed and will be provided to the selected design team during the Master Planning/Advance Planning phases. The Lead Designer selection process is scheduled to be complete by mid-March 2025, and consultant selection by the end of April. The selected team shall be ready to kick-off the project as soon as contracting is complete, and work diligently to fully staff the project. Completion of phases is anticipated as follows: Advance Planning - December 2025 Phase 1 - January 2030 Phase 2 - January 2032 Phase 3 - January 2034 The project site is located in the Central Campus precinct. The site is approximately 30 acres and is bounded by Thurman Drive and the North Carolina Railroad to the North; the Western edge of Lee Field to the West; Rocky Branch Creek to the South; and Dan Allen Drive to the East. Existing buildings on the site that are planned to be demolished as part of the project include Lee Residence Hall, Sullivan Residence Hall, Bragaw Residence Hall, West Dunn Building, and Fountain Dining Hall. Lead Designers may indicate their preference for up to three firms in each discipline via the Subconsultant Preference Form. Consultants for each of the six disciplines must submit a separate RFQ response. NC State will evaluate the sub-consultant proposals and shortlist three firms in each discipline. NC State and the Lead Designer will interview the sub-consultants who will be part of the team. The subconsultants will be contracted with, and under the full responsibility of, the Lead Designer. All questions and project submittals are to be directed to: Laura Zaytoun, Project Manager NC State University Facilities Division Design and Construction Phone 919-513-0056 llzaytou@ncsu.edu The method of Contractor Selection has not been Determined at this time.
Conceptual
Educational
$870,000,000.00
Public - State/Provincial
Demolition, LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2030
Multiple Locations, Raleigh, NC
Related To This Project
Raleigh, NC
--
Raleigh, NC
Bid Date: Jan 21 2025
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Dec 19 2024
Raleigh, NC
--
Raleigh, NC
Bid Date: Jan 08 2025
Raleigh, NC
Bid Date: Jan 09 2025
Raleigh, NC
Bid Date: Jan 14 2025
Raleigh, NC
Bid Date: Jan 16 2025
Raleigh, NC
Bid Date: Feb 14 2025
Raleigh, NC
Bid Date: Dec 30 2024
Raleigh, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.