BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2025 at 7:00 PM

Updated January 7, 2025

Site work for a water / sewer project in East Saint Louis, Illinois. Completed plans call for site work for a water / sewer project.

Lift Station Rehabilitation 5 Locations Cahokia Heights, Illinois The project consists of converting one existing suction lift lift station to a submersible duplex lift station, along with the rehabilitation of four (4) existing submersible duplex lift stations. The work includes removal and replacement of lift station pumps, control panels, valves, pressure gauges, guide bars, float switches, lift cables, disconnect switches, power & alarm cables, discharge pipe, force main, wetwell lids, valve vaults, access hatches, and fencing, together with restoration of all disturbed surfaces and all other incidental work required to complete the project. Project Signs: Project signs shall be furnished and installed at each project location. The project signs shall be 24" vertical by 36" horizontal mounted on two metal T-posts. The signs shall be in color and read as attached at the end of this section. The sign locations shall be coordinated with the Architect/Engineer. All work shall be constructed under the provisions of the Standard Specifications for Road and Bridges Construction prepared by the Department of Transportation of the State of Illinois, adopted January 1, 2022 and the Standard Specifications for Water and Sewer Main Construction in Illinois, July 2009, Sixth Edition. The only exception to these standards, are all references to measurement and payment. All proposals must be accompanied by a bid bond or cashier's check for not less than five percent of the amount of the bid. The federal prevailing rate of wages (Davis Bacon Act) shall be paid throughout the scope of the project. The Minority Business Enterprise (MBE) goal for this project is seventeen percent (17%) of the awarded amount. Bidders will be required to comply with the President's Executive Order No. 11246 as amended. The requirements for bidders and contractors under this order are explained in the specifications. The OWNER reserves the right to waive technicalities or to reject any or all proposals.

Bid Results

Water / Sewer

$1,100,000.00

Public - City

Site Work

16

8

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
96
Bidding Soon
1,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2024

January 22, 2025

Project location map

Multiple Locations, East Saint Louis, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.