Site work and paving for a road / highway in Durham, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.
2 Sections of Us 15 Business, 2 Sections of Us 70 Business, and 31 Sections of Secondary Roads. Contract Id C205007 WBS: 2025CPT.05.04.10321.1 County: Durham Length: 22.567 MI DBE Goal 6.00% Job Type: Milling, Resurfacing, and Shoulder Reconstruction A Bid Bond or Bid Deposit in the Amount of 5% of the Total Amount Bid Will Be Required. The Bidder Shall Submit an Electronic Bid Bond With Each Electronic Bid Submittal Unless They Elect to Furnish a Bid Deposit. All Questions Related to Projects During the Advertisement Period Shall Be Emailed to the State Contract Officer at Contractofficer@ncdot.gov. The Minimum Wage for Labor Will Be Shown in the Proposal Form for Federal Aid Projects. Contractor's License: a General Contractor's License Is Required in Order to Submit a Bid on Any Non-federal Aid Project Where the Bid Is $30,000.00 or More, Except for Certain Specialty Work as Determined by the Licensing Board. On Federal Projects, the Appropriate Contractor's License Shall Be Obtained Within 60 Days of Bid Opening. For Additional Information or to Make Application for a License, Visit the Contractor Licensing Board Prequalifying to Bid: All Prospective Bidders Shall Be Prequalified With the Department of Transportation Prior to Submitting a Bid. Contractors Who Are Not Prequalified May Obtain Information and Forms for Prequalifying From the Prequalification Section of the Contract Standards and Development Unit at Online All Required Prequalification Statements and Documents Shall Be Filed With the Contractual Services Management Section at Least Four Weeks Prior to the Date of Opening Bids. The Department of Transportation Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Invitation to Bid, Minority Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Sex, or National Origin in Compensation to This Award. Completion date : Sep 15, 2026 The Right Is Reserved to Reject Any or All Bids. NCDOT - 004 - Milling, Resurfacing, and Shoulder Reconstruction The work covered by this provision consists of clipping high shoulders and reconstructing the earth shoulder in accordance with Standard Drawing No. 560.01 and 560.02 of the Roadway Standard Drawings with the following exceptions: the width will be shown on typical sections, or to the existing shoulder point, whichever is nearer, as long as the desired typical is achieved. Seeding and mulching shall be performed upon completion of shoulder grading when earth borrow is used. This work shall be performed immediately after the resurfacing operations are complete as directed by the Engineer. Place incidental stone base on driveways, mailboxes, etc. immediately after paving and do not have the paving operations exceed stone base placement by more than one week without written permission of the Engineer. Remove existing 4" concrete sidewalk in accordance with the plans, this special provision and as directed by the Engineer. Remove and replace existing 4" concrete sidewalk in accordance with Section 848 of the Standard Specifications, the plans, this special provision and as directed by the Engineer. Remove existing curb & gutter and replace with 2'-6" curb & gutter in accordance with Section 846 of the Standard Specifications, the plans, this special provision and as directed by the Engineer. Remove existing 2'-6" curb & gutter in accordance with the plans, this special provision and as directed by the Engineer. Remove existing concrete curb ramp in accordance with the plans, this special provision and as directed by the Engineer. Construct in accordance with Section 848, except detectable warnings shall be of one of the following materials: engineered plastics, rubber or composite tile applied directly to the curb ramps by incorporating into the concrete of the curb ramps unless otherwise approved by the Engineer. Surface mounted rubber mats, brick, steel and stamped concrete pavers will not be accepted. Remove and reset existing brick pavers in accordance with the plans, this special provision and as directed by the Engineer. The Contractor's attention is directed to the fact that there are areas of existing pavement on this project that will require repair prior to resurfacing. Patch the areas that, in the opinion of the Engineer, need repairing. The areas to be patched will be delineated by the Engineer prior to the Contractor performing repairs. The Contractor will be required to use a milling machine suitable to performing a minimum patch of 4 ft in width when patching on all maps. At the contractor's option, the use of an electronic ticketing system for reporting individual and cumulative asphalt material deliveries may be utilized on this project. At the preconstruction conference, the contractor shall notify the Engineer if they intend to utilize an electronic ticketing system for reporting individual and cumulative asphalt material deliveries to the project. Furnish, install and maintain snowplowable delineation. There are five snowplowable delineation alternate options approved for use in North Carolina. They include the following markers and markings options: (1) Polycarbonate H-shaped Markers (2) Inlaid Raised Pavement Markers (3) 10' Rumble Skips (4) Inlaid Cradle Markers (5) 10' Inlaid Pavement Markings Only one type of snowplowable delineation will be allowed on a single project. The North Carolina Department of Transportation will administer a custom version of the Federal On-the-Job Training (OJT) Program, commonly referred to as the Alternate OJT Program. All contractors (existing and newcomers) will be automatically placed in the Alternate Program. Standard OJT requirements typically associated with individual projects will no longer be applied at the project level. Instead, these requirements will be applicable on an annual basis for each contractor administered by the OJT Program Manager. On the Job Training shall meet the requirements of 23 CFR 230.107 (b), 23 USC - Section 140, this provision and the On-the-Job Training Program Manual. The Alternate OJT Program will allow a contractor to train employees on Federal, State and privately funded projects located in North Carolina. However, priority shall be given to training employees on NCDOT Federal-Aid funded projects. Install advance/general warning work zone signs according to the Detail Drawing provided in these plans prior to beginning of work. Install and maintain signing in accordance with the attached drawings and Divisions 11 and 12 of the Standard Specifications. Furnish, install, and maintain all ADA compliant pedestrian traffic control devices for existing pedestrian facilities that are disrupted, closed, or relocated by planned work activities. The ADA compliant pedestrian traffic control devices used to either close, redirect, divert or detour pedestrian traffic are Pedestrian Channelizing Devices and Audible Warning Devices. The Contractor shall provide a Pedestrian Transport Service through and/or around the project when a traversable, firm, stable, and slip-resistant path for pedestrians cannot be maintained through the work area. At minimum, the Pedestrian Transport Service shall be on-call between the hours of 7:00 a.m. and 8:00 p.m. Monday thru Sunday, and operate at no-cost to the users.
GC Bidding
Roads / Highways
$2,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2025
March 24, 2025
Multiple Locations, Durham, NC
Related To This Project
Durham, NC
Bid Date: Jan 08 2025
Durham, NC
Bid Date: Jan 22 2025
Durham, NC
--
Durham, NC
Bid Date: Jan 28 2025
Durham, NC
Bid Date: Jan 28 2025
Durham, NC
--
Durham, NC
--
Durham, NC
--
Durham, NC
--
Durham, NC
Bid Date: Dec 31 2024
Durham, NC
Bid Date: Jan 21 2025
Durham, NC
Bid Date: Jan 07 2025
Durham, NC
Bid Date: Dec 05 2024
Durham, NC
Bid Date: Dec 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.