BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work and renovation of a mixed-use development in Sterling, Virginia. Design plans call for site work for a transportation facility; for the renovation of a transportation facility; and water / sewer project.

Scope details have not been disclosed. As of March 18, 2026 the project is in design stage. The owner has made a construction manager award. Information regarding the architect, general contractor and method of selection as well as subcontractor opportunities has not been disclosed. The construction timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The original Construction Manager at Risk RFP follows below. _____________________________________________________________________________ Any prospective offeror desiring an explanation or interpretation of the Solicitation must submit its questions via the CLMS no later than Tuesday, January 14, 2025, 2:00PM EDT. Description: The Airports Authority is seeking Construction Manager at Risk (CMR) services at Washington Dulles International Airport (IAD) to increase the airport gate capacity and improve the level of service for passengers on domestic and international flights. The work is expected to occur over 10 years and consists of the following services: Concourse E/F that will be an extension of the Tier 2 Concourse-East project that is currently under construction, and will support approximately an additional 24 narrow body and 12 wide body gates using Multiple Aircraft Ramp System (MARS); a new Federal Inspection Station (FIS) built integral with Concourse E/F; Utility Development to include systems for chilled and hot water production, distribution and storage, and electrical facilities and infrastructure; Additional Work for Expansion that may include but is not limited to security, wayfinding, technology infrastructure, utilities infrastructure, aircraft fueling facilities, airfield capacity enhancements, airfield pavements, electrical vehicle support infrastructure, and environmental sustainability. SLBE Requirement: 25%. Estimated Dollar Value Up to $1,600,000,000 over 10 years. Any prospective offeror desiring an explanation or interpretation of the Solicitation must submit its questions via the CLMS. Questions and Answers Deadline 01/14/2025, 02:00 PM (UTC-05:00) Eastern Time (US & Canada). *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Transportation Terminals

$1,600,000,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
5
Bidding Soon
1,826
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 15, 2027

Project location map

1 Saarinen Cir, Sterling, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.