Site work and new construction of a municipal facility in Butler, Pennsylvania. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

NOTE: The Supervisors of Butler Township have authorized C.S. Davidson, Inc., to act on their behalf by opening bids. Contracts will be awarded at a regularly scheduled meeting of Butler Township. A Bid Bond by acceptable surety or a certified check made payable to Butler Township in the amount of 10% of the maximum bid must be provided by each bidder with each bid. A Performance Bond and Payment Bond each in the amount of 100% of the contract price shall be required from the Successful Bidder. An anti-collusion affidavit is required for this Bid. While Bidders may make comments to clarify their bid, Bidders cannot change, modify, delete, alter, amend, or make additions to the wording to any of the Bidding Documents, including but not limited to the Agreement. Unauthorized conditions, exceptions, limitations, or provisions attached to a Bid may be cause for rejection of the Bid. Any questions regarding the Bidding Documents shall be submitted via Online and the Bidding Documents may only be modified by Addenda issued by the Township prior to the Bid opening date. Questions Due Date: Jan 28th 2025, 5:00 PM EST All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing via the "Messages/Vendor Discussions" feature in PennBid. Replies will be issued by Addenda, posted within the "Bidding Documents" feature in PennBid and an email notification sent to all parties recorded as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of bids will not be answered. Only questions answered by formal wri Each bidder must be prepared to submit evidence of his qualifications to perform the work. Notice is hereby given to bidders that all Contracts are subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended. The Contract Time for all Contracts is two hundred seventy (270) calendar days. The Board of Supervisors for Butler Township intends to award a contract for the Base Bid and any combination, or none, of the Alternate Bid Items. The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents. The lowest responsive Bid will be determined on the basis of the sum of the Base Bid and Alternates accepted. The Township reserves the rights to reject any or all bids; to waive any defects, errors, omissions, irregularities or informalities in a bid or the bid procedure; and to accept any bid which it may deem to be for or in the best interest of Butler Township. Bids may be taken under advisement and the award of contract, if awarded, will be made within 60 days after the date of the opening of the bids, or otherwise provided by law. The Board of Supervisors reserves the rights to formally accept a bid and award a Contract by public announcement at a regular meeting of the Township. Butler Township is an Equal Opportunity Employer. Minority and women owned businesses and those defined as SERB's under State regulations are encouraged to submit proposals. Bidders certified under a federal DBE/MBE/WBE program are similarly encouraged to submit proposals. Butler Township, Ed Wilkinson, Chair A pre-bid conference will not be held. The site will be made available to interested bidders who will be notified through PennBid with available dates and times. The Owner fully intends to construct the work for which bids are solicited. However, the Owner specifically reserves the right, which all Bidders acknowledge by submission of a bid, to reduce quantities and/or eliminate portions of the project to meet available finances. Reduction of quantities or elimination of portions of the project will not constitute grounds of additional or compensatory charges to the low bidder. The Owner may award any number of combinations of the multiple contracts involved with the project. Bid Result. General Construction: WSL Incorporated $1,695,000.00 Mechanical Construction: Garden Spot Mechanical, Inc. $226,000.00 Electrical Construction: Shannon A. Smith, Inc. $386,253.00 Plumbing Construction: Mann Plumbing and Heating LLC $145,970.00

Award

Municipal

$2,307,253.00

Public - City

New Construction, Site Work

38

56

17

8

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Pipe and Tube Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber, Sheathing, Subflooring, Shop-Fabricated Structural Wood, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Metal Wall Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
89
Bidding Soon
1,790
All Active Projects
764
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

April 7, 2025

img_map_placeholder

W York St, Butler, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Building for Butler Township

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.