Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Renovation of a municipal facility in Sarnia, Ontario. Conceptual plans call for the renovation of a municipal facility.

The elevator replacement design will include a new compliant elevator that will accommodate tenants on all occupied floors. This includes installation of a new passenger elevator accessible to the main entrance that will meet NBC, ACA, & AODA codes as well fire fighter emergency operation requirements, including allow for prone stretcher access. TIMELINE: An RFP for design closed, and no award was made. Coverage has been discontinued at this time.

Project Abandoned

Municipal

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
146
Bidding Soon
2,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2026

Project location map

105 Christina St S, Sarnia, ON

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed