Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work and paving for a mixed-use development in Hartford, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of March 6, 2025, the project was awarded to Kruczek Construction, Inc. , with an awarded amount of $1,195,5.55 ** 2025 Hartford Street Reconstruction Project (E. Wisconsin St, Fifth St & Sixth St) Description: Bids are being solicited from contractors for the installation of the following estimated quantities: o MOBILIZATION o TRAFFIC CONTROL o EROSION CONTROL o SITE CLEARING AND GRADING o PAVEMENT, CURB AND GUTTER, DRIVEWAY AND SIDEWALK DEMOLITION SAW CUT ASPHALT PAVEMENT o EXCAVATION AND FILL o EXCAVATION BELOW SUBGRADE o ROCK EXCAVATION o 12-INCH DENSE GRADED BASE COURSE, 1 1/4-INCH o 4-INCH DENSE GRADED BASE COURSE, 3/4-INCH o HMA PAVEMENT, LT 58-28 S (9.5 mm) o HMA PAVEMENT, LT 58-28 S (19.0 mm) o CONCRETE CURB & GUTTER o CONCRETE DRIVEWAY, 6-INCH o ASPHALT DRIVEWAY, 3-INCH o GRAVEL DRIVEWAY o CONCRETE SIDEWALK, 4-INCH o CONCRETE SIDEWALK, 6-INCH o DETECTABLE WARNING FIELD - YELLOW CAST IRON o TOPSOIL, SEED, FERTILIZER, AND HYDROMULCH o RETAINING WALL REMOVAL AND REPLACEMENT o TURF REINFORCEMENT MAT o WATER SERVICE, PE, 1 1/4-INCH o CURB STOP WITH BOX o HYDRANT ASSEMBLY WITH LEAD, VALVE, AND BOX o GATE VALVE & BOX, 6-INCH o GATE VALVE & BOX, 8-INCH o GATE VALVE & BOX, 10-INCH o WATER MAIN, PVC, 6-INCH o WATER MAIN, PVC, 8-INCH o WATER MAIN, PVC, 10-INCH o CONNECTION TO EXISTING WATER MAIN o CONNECTION TO EXISTING SANITARY SEWER o SANITARY SEWER, PVC, 8-INCH o SANITARY LATERAL, PVC, 6-INCH o SANITARY MANHOLE, 4-FT DIAMETER o SEWER BYPASS PUMPING o STORM SEWER PIPE, REINFORCED CONCRETE CLASS III, 12-INCH o CATCH BASIN o STORM MANHOLE, 4-FT DIAMETER o CONNECTION TO EXISTING STORM SEWER o Other Related Miscellaneous Work No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the total bid, made payable to the City of Hartford, such guarantee to be forfeited should the successful Bidder fail to enter into the contract. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond, each equal to 100 percent of the contract price. The Common Council of the City of Hartford reserves the right to reject any or all bids with respect to irregularities or technicalities, or to reject all bids outright, and further, to award the contract to the contractor who, in the judgment of the Common Council, will best serve the interest of the City of Hartford. All bids shall remain subject to acceptance for 60 days after the time set for opening Bids.

Award

Sidewalks / Parking Lot

$1,195,556.00

Public - City

Paving, Site Work

56

9

4

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
5
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

May 1, 2025

Project location map

Multiple Locations, Hartford, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.