Site work, paving and outdoor lighting for a mixed-use development in Cortland, Ohio. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of March 21, 2025, the project has been awarded to Kokosing Construction Company. Project amount is $56,307,400.93. Mainline Pavement Reconstruction, Milepost 154.10 to Milepost 159.80, Cuyahoga County, Ohio Bids Are to Be Submitted in Accordance With the Contract Documents Prepared by the Commission. Failure to Certify a Commitment to Meet the Sbe Goal or Failure to Satisfactorily Demonstrate Good Faith Efforts Used to Attain Sbe Participation for This Project Shall Be Grounds for the Commission to Consider the Bid Nonresponsive and May Cause the Bid to Be Rejected. Pollution Liability Insurance is Required Under Gc Art. 12.1.3 for This Project. Bids Will Be Received for This Project, Which Includes the Following: the Work to Be Performed Under the Contract, if Any is Awarded on the Basis of the Bids, Consists of Removing and Reconstructing the Pavement in the Right Two (2) Lanes and Right Shoulders in Both Eastbound and Westbound Directions of the Ohio Turnpike, Lowering the Mainline Profile Consisting of Pavement Removal and Reconstruction of the All Three (3) Lanes and Two (2) Shoulders in Both Eastbound and Westbound Directions of the Ohio Turnpike Between Mileposts 157.05 to Milepost 157.39 and Resurface the Left Lanes and Left Shoulders of Both Eastbound and Westbound Directions Between Mileposts 154.10 to Milepost 159.80. The Work Includes, but is Not Limited to, Excavating Existing Pavement, Chemically Stabilizing the Subgrade, Constructing Full Depth Pavement, Performing Drainage Repairs and Replacements, Tree Removal, Right of Way Fence Replacement, Installing Concrete Barrier Wall, Asphalt Curbs, Slope Repair, Guardrail, Pavement Markings and Other Traffic Control Devices, Performing Temporary Traffic Control and Minor Lighting Work. All Work is to Be Performed as Per the Plans, Drawings, Specifications, Special Provisions, Technical Specifications, and Other Contract Documents for This Project. Prevailing Wage Rates and Equal Employment Opportunity Requirements Apply to This Project. The Small Business Enterprise (Sbe) Goal Applicable to This Project is 20%. Question Deadline 01/10/2025 Bidders Should Submit All Questions No Later Than Seven (7) Days Prior to Bid Opening. A Contract Will Be Awarded, if Any Award Be Made, to the Bidder Determined to Have Submitted the Lowest Responsive and Responsible Bid for the Performance of the Work. The Commission Reserves the Right to Reject Any and All Bids and to Waive Minor Irregularities or Technical Deficiencies.
Award
Roads / Highways
$56,307,400.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 25 - Integrated Automation
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2025
February 17, 2025

Multiple Locations, Cortland, OH
Related To This Project
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
Bid Date: Mar 19 2025
Cortland, OH
--
Cortland, OH
Bid Date: Nov 26 2024
Cortland, OH
Bid Date: Nov 06 2024
Cortland, OH
Bid Date: Sep 25 2024
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Mainline Pavement Reconstruction, Milepost 154.10 to Milepost 159.80
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.