Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 23, 2024 at 7:00 PM
Updated October 1, 2024
Renovation of a water / sewer project in Dover, Delaware. Conceptual plans call for the renovation of a water / sewer project.
This work is detailed in the PFAS Treatment Feasibility Study & Design Request for Proposal, Proposal No.: 25-0016WW. The City is seeking proposals from experienced and qualified Delaware-licensed engineering firms for entering into an agreement for this feasibility study and design project. The work is located at the City of Dover's Long Point Road Water Treatment Plant. This work includes coordination with City of Dover staff and pilot study team, feasibility study, permitting, development of construction drawings and technical specifications, and cost estimate for proposed work. No Proposer may withdraw their bid within ninety (90) days after the actual date of the opening thereof. Question Deadline 01/21/2025 If you have questions concerning this Request for Proposal, they must be made in writing and emailed to me at doverwhse@dover.de.us. The right is reserved, as the interests of the City of Dover may appear, to reject any and all proposals, to waive any information in proposals received, and to accept or reject any items of any proposal. Minority, women, veteran, service-disabled veteran, and individuals with disabilities owned vendor preference shall be three percent (3%) of the value of the award. The vendor must identify qualification and claim to the preference on the submitted proposal documents. The vendor must provide authoritative proof of minority ownership such as identification in the certification directory maintained by the State of Delaware Office of Supplier Diversity to qualify for this preference. This preference is to be considered as a stand-alone and cannot be added to any other preference that may be allowed. This preference shall not apply to subcontractors. A performance bond shall be required from the successful proposer for a construction contract. Such a bond shall be for the full amount of the contract. If the contractor fails to provide such a bond or a binder within fifteen days of the award of the contract, the award of the contract or the contract shall be void. The bond shall be released by the City of Dover upon successful completion of the contract and upon a detailed inspection of the contracted work. The City of Dover shall have the right to reject any or all proposals if deemed to be in the best interest of the City, such as but not limited to local vendor preference and minority vendor preference while awarding. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$3,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026

To Be Determined, Dover, DE
Related To This Project
Dover, DE
Bid Date: Jan 15 2025
Dover, DE
Bid Date: Mar 14 2025
Dover, DE
Bid Date: Feb 12 2025
Dover, DE
Bid Date: Feb 18 2025
Dover, DE
Bid Date: Feb 13 2025
Dover, DE
Bid Date: Jan 17 2025
Dover, DE
Bid Date: Jan 16 2025
Dover, DE
Bid Date: Dec 17 2024
Dover, DE
Bid Date: Dec 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.