Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Site work for a water / sewer project in Carlinville, Illinois. Completed plans call for site work for a water / sewer project.
Water Main Replacement sealed Bids for Water Main Replacement, PWSLP L17 4333 for of construction of a new 8-inch diameter PVC water main, valves, connections to existing water main, replacement of service connections including corporation and curb stops. Substantial Completion: within 90 days. Final Completion: within 120 days. Bidding is per 30 ILCS 500 and 557 and any resulting Contract is subject to applicable provisions of the Illinois Compiled Statutes (ILCS) and municipal codes and ordinances. Project Funding: in part through Illinois State Revolving Fund (SRF). Compliance required with: EPA provisions & policies, regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35 IAC Part 662), Davis-Bacon Act (40 USC 276a through 276a-5), the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), Section 436 of the Consolidated Appropriations Act, 2014, and the federal "Build America, Buy America Act". Certified DBE participation goals: minimum 5% D/MBE & 12% D/WBE applicable to total dollars paid under resulting Contract. Aggregate workforce goals in each trade on all construction work in the covered area: WBE 6.9 percent (Statewide) & MBE 11.4 percent (Macoupin County) Deputy City Clerk with Bid security at 5% of total Bid. The Illinois Prevailing Wage Act (820 ILCS 130/1-12) applies to the resulting public works Contract and payment of prevailing wages is required. The Davis Bacon Act and Federal Minimum Wage Rates as determined by the U.S. Dept. of Labor also apply to this Project per SRF requirements. In case of discrepancy between State prevailing wage rates and Federal wage rates, the higher wage rates shall apply Question Deadline 01/24/2025 at 4:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing by email as follows. Woodard & Curran, Inc. Mackenzie Klekamp Email: mklekamp@woodardcurran.com (and a copy to kstrickler@woodardcurran.com)
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
March 13, 2025
Multiple Locations, Carlinville, IL
Related To This Project
Carlinville, IL
Bid Date: Jan 16 2025
Carlinville, IL
Bid Date: Apr 03 2025
Carlinville, IL
Bid Date: Apr 03 2025
Carlinville, IL
--
Carlinville, IL
--
Carlinville, IL
Bid Date: Jan 16 2026
Carlinville, IL
Bid Date: Oct 30 2025
Carlinville, IL
Bid Date: Nov 12 2024
Carlinville, IL
Bid Date: Jan 17 2025
Carlinville, IL
Bid Date: Sep 03 2024
Carlinville, IL
Bid Date: Jul 30 2024
Carlinville, IL
Bid Date: Jul 17 2024
Carlinville, IL
Bid Date: Apr 30 2024
Carlinville, IL
Bid Date: Mar 28 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed