Site work and new construction of a water / sewer project in Washington, District of Columbia. Completed plans call for the construction of a water / sewer project.
Question Deadline 01/13/2025 Install new copper service tubing, corporation stop (if required), curb stops and boxes, water meter boxes and frames, ball valves, service saddles and fittings to remove existing and reinstate water service to the customer through trenchless methods. Work may include core drilling and necessary adapters and fittings necessary required to reinstate water service to the customer. 2. Disposal of existing domestic lead service lines including removed corporation stops, curb stops and boxes, lead service tubing, valves, adaptors, excess soil, concrete, asphalt, vegetation and contaminated material and old water meters if directed by DC Water in accordance with all local and Federal restrictions. 3. Providing necessary traffic control to meet DDOT requirements to allow work within the public right of way. 4. Excavation, backfill and compaction including District required erosion and sediment control as well as tree protection. 5. Coordinating with DC Water and LFG. 6. The LFG and DC Water will obtain most of the required right-of-entries and will provide preliminary block scheduling to the Contractor based on number of entries obtained. Right-of-Entries, obtained traffic control permits and schedules will be provided to the contractor post bid. For any address on a block where neither the LFG nor DC Water has obtained Right-Of-Entry forms, the addresses will be assigned to the contractor to obtain the Right-Of-Entry prior to scheduling the block for replacement. 7. The Contractor shall provide detailed block schedule and be responsible for coordination and scheduling work on an overall program and individual block basis. The LFG and DC Water reserves the right to expediate, delay or remove blocks due to ongoing coordination of work throughout the City at no additional cost to DC Water. Work will also include promotion of the replacement program through the targeted use of door hangers, flyers, matrix message boards, yard signs, etc in the work area. 8. Pavement and concrete removal, including saw cutting as required. 9. Temporary water service if the customer is without water for more than 8 hours over the course of any 24 hour period. 10. Restoration of interior drywall (as-needed). 11. Broom clean all interior rooms, sidewalks, walkways and other areas used by the Contractor to access the work. 12. Installation of temporary pavement and maintaining it until permanent is installed. 13. All final surface restoration work to restore all areas disturbed by construction to conditions equal to or better than pre-construction conditions. For water service line replacements, exterior restoration shall occur within 20 business days, and interior restoration within 2 business days. For Access not Granted, all temporary and permanent interior and exterior restoration shall occur within 2 business days. 14. Dewatering and excavation support and protection. 15. Trenchless installation, leakage testing and flushing of new service lines and connecting to existing water meters. 16. Photographic documentation pre- and post-construction activities input into GIS database. 17. Installing of new service taps into the water main 18. Compilation of as-built information for the completion of service tap cards to be entered into DC Water's 3PP system. 19. All other work, including but not limited to submittals; providing temporary facilities; all specified special provisions; environmental protection; erosion and sedimentation control; site preparation; rock excavation; removal of concrete road base, trenching; decking; furnishing and installing repair clamps; furnishing and installing granular fill materials; pipeline cleaning, and flushing; dust control; final/permenant pavement, curb and sidewalk repair and resurfacing; landscaping; loaming and seeding; sodding which shall be used only at the direction of DC Water and shall be per DDOT requirements, surface restoration; miscellaneous work and cleanup; and all else incidentals required for successful completion of the work as specified.
Post-Bid
Water / Sewer
$5,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2025
March 24, 2025
Multiple Locations, Washington, DC
Related To This Project
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jan 06 2025
Washington, DC
Bid Date: Mar 04 2025
Washington, DC
Bid Date: Jan 14 2025
Washington, DC
Bid Date: May 22 2025
Washington, DC
Bid Date: Jan 09 2025
Washington, DC
Bid Date: Dec 19 2024
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jul 22 2025
Washington, DC
Bid Date: Dec 24 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.