BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work and paving for a mixed-use development in Eastpointe, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000371377 Reconstruction of Ash Avenue from Kelly Road to Beaconsfield. Details are in the Bid Packet. The approximate quantities for the major items of work involved in this project are as follows: Dr Structure, Rem 12 Ea Sewer, Rem, Less than 24 inch 268 Ft Pavt, Rem 6,950 Syd HMA Surface, Rem 5,600 Syd Sidewalk, Rem 350 Syd Station Grading 18 Sta Sewer, Cl IV, 12 inch, Tr Det B 1,365 Ft Dr Structure, 24 inch 9 Ea Dr Structure, 48 inch 5 Ea Underdrain, Subgrade, Open-Graded, 6 inch 3,550 Ft Geogrid Separator 6,850 Syd Aggregate Base, 8 inch 6,850 Syd Conc Pavt with Integral Curb, Nonreinf, 8 inch 6,450 Syd A.-2 Driveway, Nonreinf Conc, 4 inch 200 Syd Driveway, Nonreinf Conc, 6 inch 300 Syd Sidewalk, Conc, 4 inch 1,300 Sft Sidewalk, Conc, 6 inch 1,150 Sft Curb Ramp, Conc, 4 inch 550 Sft Curb Ramp, Conc, 8 inch 425 Sft Topsoil Surface, Furn, 3 inch 1,250 Syd Hydroseeding 1,250 Syd General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % -- Each proposal shall be accompanied by a certified check in the amount of five percent (5%) of the proposal, payable to the City of Eastpointe, as security for the acceptance of the contract. A bid bond on the Michigan Standard Form, issued by an approved Surety Company, may be furnished in lieu of a certified check. No bid may be withdrawn for a period of sixty (60) calendar days after the receipt of bids The right to accept any bid, to reject any or all proposals and to waive irregularities in bidding is reserved by the City of Eastpointe. Portions of this Contract may be deleted due to unforeseen circumstances without compensation. Acceptance of any bid does not constitute a binding agreement until a written Contract is signed by both parties. The successful bidder will be required to furnish satisfactory performance, payment, maintenance and guarantee bonds and insurance certificates. Question Deadline 01/09/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Work will be substantially completed on or before July 25, 2025 ; Final completion- August 8, 2025. the project consists of 0.34 miles of complete removal of the existing concrete pavement structure and the replacement thereof with nonreinforced concrete pavement withintegral curb on an aggregate subbase along with storm sewer reconstruction, sidewalk reconstruction, driveway reconstruction and other miscellaneous related items of work.

Bid Results

Roads / Highways

$1,046,335.00

Public - City

Paving, Site Work

30

15

5

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
3
Bidding Soon
1,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

April 7, 2025

Project location map

Ash Ave, Eastpointe, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.