EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in McAlester, Oklahoma. Completed plans call for site work for a water / sewer project.

Separate sealed BIDS for the construction of: Construction of approximately 1,400 LF 8-inch PVC Sewer Main and approximately 950 LF 8-inch PVC Water Main and appurtenances. All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in, in ink or typewritten, and the BID form must be fully completed and executed when submitted. Only one Copy of the BID form is required. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Bids received more than ninety-six (96) hours before time specified and Bids received after the time set for opening Bids will not be considered and will be returned unopened. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID schedule by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done. The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned and rights-of-way acquired or to be acquired. Each bid must be accompanied by a bid bond payable to the OWNER for five percent of the total amount of the bid. A certified check may be used in lieu of the bid bond. No bid security is required if bid is $100,000.00 or less. As soon as the bid prices have been compared, the OWNER will return the bonds of all except the three lowest responsible bidders. The bid bond of the successful bidder will be retained until the Performance Bond, Statutory Bond, Maintenance Bond and Certificate of Insurance have been executed and approved, after which it will be returned. The bid security of the two remaining unsuccessful Bidders will be returned after the successful Bidder has entered into a contract and has furnished the required bonds and insurance. A Performance Bond, Statutory Bond and Maintenance Bond each in the amount of 100 percent of the Contract Price with a corporate surety approved by the OWNER will be required for the faithful performance of the Contract. Attorneys-in-fact who sign Bid Bonds and Performance Bonds must file with each Bond a certified and effective dated Copy of their Power-of-Attorney. The OWNER shall award a contract to the lowest responsible bidder or bidders within sixty (60) calendar days after bid opening. The OWNER may extend the award period not to exceed fifteen (15) calendar days by formal recorded action and for good cause. The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond, Statutory Bond, Maintenance Bond and Certificate of Insurance within ten (10) calendar days from the date when Notice of Award is delivered to the Bidder. The Notice of Award shall be accompanied by the necessary Agreement and Bond forms. In the failure of the Bidder to execute the Agreement, the OWNER may consider the Bidder in default in which case the Bid Bond accompanying the proposal shall become the property of the OWNER. The OWNER within ten (10) calendar days of receipt of acceptable Agreement, Bonds and Certificate of Insurance signed by the party to whom the Agreement was awarded shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may by WRITTEN NOTICE withdraw the signed Agreement. Such NOTICE of withdrawal shall be effective upon receipt of the NOTICE by the OWNER. The time for completion is 90 consecutive calendar days. Liquidated damages will be $500.00 per calendar day plus Engineering and Resident Project Representative costs as defined in the Contract. The Contractor will be required to begin work within ten (10) calendar days of the date shown on the Notice to Proceed. In the event of a conflict between the plans and specifications, the specifications will govern. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing in accordance with the Request for Information form. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda or Request for Information mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The Engineer is: Infrastructure Solutions Group, LLC Project Manager: Robert Vaughan, P.E. Address: 500 Village Blvd., Suite A, McAlester OK 74501 Phone Number: (918)420-5500 Fax Number: (918)420-5500 Email: Robert.Vaughan@isgengineering.com Question Deadline 01/09/2025

Bid Results

Water / Sewer

$712,498.00

Public - City

Site Work

14

13

2

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
25
Bidding Soon
343
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 17, 2025

img_map_placeholder

Multiple Locations, McAlester, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Van Buren Utility Extension - ReBid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.