BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a civil project in Lake Havasu City, Arizona. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 21, 2025, this Project is in design. A pre- Construction Manager has been awarded. We cannot proceed with construction until we have received the required permit from the US Coast Guard, as the bridge will be crossing a navigable waterway. Permitting process could take between 10 and 12 months . A full GMP for construction services will be negotiated when it is close to time to start the actual construction of the bridge and roadways. The closed solicitation has been included below for reference: The owner has determined a prequalified list of construction managers. Written Question Deadline January 13, 2025 Lake Havasu City is interested in receiving Statements of Qualifications (SOQs) from qualified Construction Managers at Risk (CMAR) to provide pre-construction services and construction services for the Second Bridge and Roadway Construction Project. Statements of Qualifications submitted must address, at a minimum, all issues brought forth in this Request for Statements of Qualifications (RFSQ). This project Design and Construction is funded by the State of Arizona Legislative Funding. The Second Bridge and Roadway network have been determined to be needed for Emergency Evacuation and Emergency Access to serve the isolated Island Community should the London Bridge and utilities within the superstructure be deemed unpassable or unusable. The Second Bridge will provide a secondary alternate route. Lake Havasu City is interested in receiving Statements of Qualifications (SOQs) from qualified Construction Managers at Risk (CMAR) to provide pre-construction services and construction services for the Second Bridge and Roadway Construction Project. Lake Havasu City may reject any SOQ not in compliance with all prescribed public competitive procurement procedures and requirements, and may reject for good cause any or all SOQs if Lake Havasu City finds it is in the public interest to do so.

Pre-Construction/Negotiated

Roads / Highways

$458,043.00

Public - City

Paving, Site Work

10

8

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
71
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

August 17, 2026

Project location map

Palo Verde Blvd S, Lake Havasu City, AZ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.