Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2025 at 7:00 PM
Updated February 1, 2025
Demolition, site work, renovation and addition to a mixed-use development in Lansing, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
The project shall consist of one lump sum base bid proposal for the following work: Contractor to provide work as indicated on the Project Drawings and herein specified: Heritage Middle School 1. Rehabilitation of existing School and District Administrative Area and provision of an addition. Administration Rehabilitation Area: 5,157 square feet. Addition Area: 1,408 square feet. Scope includes interior demolition, interior and exterior concrete, masonry exterior walls, steel joists and decking, metal wall panels, PVC roofing, metal stud and gypsum drywall interior walls, masonry interior walls, doors/frames, windows, aluminum storefront, suspended acoustical tile ceilings, flooring, paint, casework, HVAC/mechanical, plumbing, electrical/lighting and fire alarm work. 2. Provision of an exterior polycarbonate canopy with a steel structure. Scope includes concrete, masonry, structural steel, polycarbonate canopy and electrical/lighting work. 3. Rehabilitation of Receiving Area and Gym Storage Room. Scope includes interior demolition, masonry, doors/frames, wire mesh partition, painting and electrical work. 4. Replacement of student lockers and replacement of flooring in main locker area. Nathan Hale Elementary School 1. Removal of seven (7) moveable partitions. Scope includes metal stud and gypsum drywall wall, paint and electrical work. All proposals shall be enclosed and sealed in an envelope and have a space on the outside of the envelope properly filled in with the name of the Contractor, name of the trade, name of the job and date of opening. Contractors submitting bids shall be notified after Bid Opening as to the Bidder's List and Base Bid Proposal by all Contractors. The Board of Education reserves the right to reject any or all bids.
Bid Results
Educational
$2,781,340.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
June 4, 2025
Multiple Locations, Lansing, IL
Related To This Project
Lansing, IL
Bid Date: Jan 10 2025
Lansing, IL
Bid Date: Mar 07 2025
Lansing, IL
Bid Date: Mar 10 2025
Lansing, IL
Bid Date: Mar 28 2025
Lansing, IL
Bid Date: Apr 30 2025
Lansing, IL
Bid Date: May 16 2025
Lansing, IL
Bid Date: Sep 04 2025
Lansing, IL
Bid Date: Sep 19 2025
Lansing, IL
Bid Date: Dec 16 2024
Lansing, IL
--
Lansing, IL
Bid Date: Aug 15 2024
Lansing, IL
Bid Date: Feb 06 2025
Lansing, IL
Bid Date: Jul 18 2024
Lansing, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
