BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work and paving for a bridge / tunnel in Dafter, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

JOB NUMBER: 218233 CONTROL SECTION: 17000 Bridge removal, bank excavation, placing riprap and approach work on Nicolet Road (12 Mile Road) over the Charlotte River, Chippewa County. This is a Local Agency project. Net classification required for this project is 193 Fa 0% Dbe Participation Required Control Sec Job No Federal No BO 17000 218233A 25A0130 Completion Date: 12/1/2025 MI DOT - 2501 041 - Bridge Removal, Bank Excavation, Placing Riprap and Approach Work on Nicolet Road (12 Mile Road) MBE (5.2%), WBE (6.9%), DBE (0%)

Bid Results

Bridges / Tunnels

$190,547.00

Public - State/Provincial

Paving, Site Work

24

9

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
90
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

March 1, 2025

Project location map

12 Mile Rd, Dafter, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.