BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2025 at 7:00 PM

Updated February 3, 2025

Demolition, site work, paving and new construction of a civil project in Pelham, Alabama. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; water / sewer project; road / highway; and road / highway.

Shelby County Contract Time: 980 Calendar Days DBE Goal Percent:3.00 for constructing the Roadway Improvements and Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, and Bridge Replacement) on I-65 from a point 0.560 mile south of Buck Creek to a point 1.000 mile north of the SR-3 (US-31) Interchange in Alabaster. Length 3.111 mi. The Bracket Estimate on this project is from $61,605,597 to $75,295,730 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 001 - Constructing the Roadway Improvements and Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, and Bridge Replacement) on I-65 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Bridges / Tunnels

$75,295,730.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

364

10

75

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
1
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

April 1, 2025

Project location map

I-65, Pelham, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.