BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work for a water / sewer project in Fargo, North Dakota. Completed plans call for site work for a water / sewer project.

14th St Watermain Crossing Site Address: 225 4th Street North Est. Value: $ 479,113.00 Est. Completion Date: July 1, 2025 Description: This project will stub a new cased 16" watermain under BNSF tracks from NP Ave to Main Ave to be connected into as a part of the 2026 Main Ave reconstruction project. Ultimately, this new 16" watermain will replace the existing 14" cast iron pipe which crosses the BNSF tracks at 15th St. The existing 14" watermain is currently underneath the structure at 1442 Main Ave and a watermain break would be difficult and costly to repair.

Award

Water / Sewer

$553,003.00

Public - City

Site Work

32

5

6

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
16
Bidding Soon
214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

February 14, 2025

Project location map

14th St S, Fargo, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.