BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work and new construction of a civil project in Arctic Bay, Nunavut. Completed plans call for the construction of a one-story above grade water / sewer project; and for site work for a water / sewer project.

Work under this contract consists of, but is not limited to, construction of new water treatment infrastructure comprising raw water intakes, storage tanks, water treatment plant, generators, emergency fire water tank and ancillary components. The work includes all associated supply, manufacturing, factory testing, transportation, site works, installation, testing, commissioning, warranty, and one-year operation, as noted in drawings and specifications. The work also includes decommissioning of the existing water treatment plant. Question Deadline 02/10/2025 Documents can be obtained from http://www.nunavuttenders.ca

Award

Water / Sewer

$38,909,392.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

124 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
2
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

May 12, 2025

Project location map

To Be Determined, Arctic Bay, NU

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.