BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2025 at 7:00 PM

Updated January 23, 2025

Site work for a water / sewer project in Orange, Texas. Completed plans call for site work for a water / sewer project.

The project scope for the Base Bid includes but is not limited to: Rehabilitation of FM 1136 150,000-Gallon Elevated Storage Tank Question Deadline 01/03/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Acquire any necessary insurances Mobilize and prepare site Complete repair items of work listed in Section 13200, Part 3, Paragraph c, Items i through xiv Complete repair items of work listed in Section 13200, Part 3, Paragraph d, Items i and ii Repair pits and prior corrosion damage by applying four (4) gallons of TNEMEC Series 215 pit filler Repair pits and prior corrosion damage by welding Replace the interior coating system and provide dehumidification equipment Set up containment Replace the exterior coating system Furnish and install two (2) logos Furnish and install eight (8) exterior logo lights Provide final inspection, disinfection and demobilize The project scope for Additive Alternate Bid #1 includes but is not limited to: Rehabilitation of FM 2802 150,000-Gallon Elevated Storage Tank Acquire any necessary insurances Mobilize and prepare site Complete repair items of work listed in Section 13200, Part 3, Paragraph c, Items i through xiv Complete repair items of work listed in Section 13200, Part 3, Paragraph e, Items i and ii. Repair pits and prior corrosion damage by applying four (4) gallons of TNEMEC Series 215 pit filler Repair pits and prior corrosion damage by welding Replace the interior coating system and provide dehumidification equipment Set up containment Replace the exterior coating system Furnish and install two (2) logos Furnish and install eight (8) exterior logo lights Provide final inspection, disinfection and demobilize The project scope for Additive Alternate Bid #2 includes three (3) warranty options for each of the FM 1136 and FM 2802 Elevated Storage Tank over the construction contract time of 24-months. These three (3) additional options are for an additional 12-month, 36-month, and 72-month warranty for labor/materials.

Bid Results

Water / Sewer

$365,300.00

Public - County

Site Work

7

11

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
49
Bidding Soon
730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

February 14, 2025

Project location map

Multiple Locations, Orange, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.