Published February 15, 2025 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a mixed-use development in Hackensack, New Jersey. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and water / sewer project.

The work will include, but is not limited to, the construction of three (3) new synthetic baseball fields with underdrains, fencing, safety netting, sports lighting, bleachers, and dugouts. Additional site improvements will include drainage improvements, a new precast concrete press box, new site lighting fixtures, site landscape features, and utility connections within Foschini Park, located in the City of Hackensack. The work will also require the placement of RCA in order to surcharge existing soils for approximately four (4) months. This material will be delivered and supplied by others. The Contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this Project as described in the Construction Documents. The Contract will allow 365 calendar days for completion of the work from the Notice to Proceed. One hard copy of the Bids shall be made on the forms provided and made part of the Contract Documents, Bids shall be made on the forms provided and made part of the Contract Documents, which SHALL be submitted in triplicate, One Stamped Original, and Two Stamped Copies. A certified check or cashier's check made payable to the order of the City of Hackensack, or a duly executed Bid Bond, in the amount of ten percent (10%) of each Bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that they can obtain the required Performance Bond. The Successful Bidder will be required to deliver to the Owner an executed Performance Bond and Payment Bond of a responsible indemnity company authorized to do business in the State of New Jersey. Bid submission info : The submitted Bid packages shall be complete with the Bid description and the name and address of the Bidder marked clearly on the outside of the envelope. Bids must be placed in sealed envelopes and received by mail or hand delivered in person to the City Clerk's office located at 65 Central Avenue, 3rd Floor, Hackensack, New Jersey 07601. The envelope must also identify the Bid as "City of Hackensack Foschini Park Phase I Improvements". The City of Hackensack reserves the right to consider Bids for sixty (60) days after their receipt. The right is reserved to waive any informalities, to accept Bids which it deems most favorable to the interest of the City to make an award on each item separately or as a whole and to accept any Bid or to reject any or all Proposals in accordance with the Specifications and the Bid forms. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Outdoor Lighting, Site Work

28

8

40

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Purpose Rooms, Athletic and Recreational Special Construction, Safety Netting, Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Electrical Utility Services
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors, Graders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
309
Bidding Soon
5,371
All Active Projects
2,179
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

March 22, 2025

img_map_placeholder

278 River St, Hackensack, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Foschini Park Phase I Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.