Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work for a water / sewer project in Mechanicville, New York. Completed plans call for site work for a water / sewer project.

Raw Water Pump Station Improvements Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 20% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Disadvantaged Owned Sub-Contracting Goal: 20% Contract term: 1 year Location: 33 George Thompson Road Mechanicville, NY 12118 Document notes For information concerning the proposed Work, contact John Frazer, Senior Managing Engineer, Barton & Loguidice, D.P.C., 10 Airline Drive, jfrazer@bartonandloguidice.com. Bidding Documents may be viewed and ordered online by registering with the Issuing Office at online. The date that the Bidding Documents are downloaded will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Separate Bids will be received for the following schedules of Work: Contract No. 1A General Construction. Contract No. IB Electrical Construction. Bidders, at their option, may submit a separate and independent Bid for any or all of the separate schedules of work contemplated under this Advertisement for which they are properly licensed to perform. All segments will be awarded separately, per the divisions of Work as described herein. Bid alternates may be included, as deemed in the Owner's best interest. The Project consists of constructing various improvements to the City's Raw Water Pump Station, including building envelope and general site improvements, pump and VFD replacement, and the installation of an emergency generator and automatic transfer switch. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security, as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) prescribed in the Bidding Documents. In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain such license as required by State statutes, and Federal and local Laws and Regulations. Purchases made by the City of Mechanicville are not subject to any Federal, State, or local sales tax. Bidders shall not include in their bid sales and compensating use taxes on the cost of materials. Exemption certificates will be executed upon request. Bids will not be accepted from Bidder's determined to be "Non-Responsible Entity" by the New York State Office of General Services. This Project is a "Covered Project" under New York State Labor Law 220-I and the Bidder must hold a valid Certificate of Registration from the New York State Department of Labor to submit a bid and at all times for the duration of the Work. Bids will not be accepted from Bidders that have not registered or that have been barred from competing on public works under General Municipal Law 5A-103-b. The Owner strongly encourages Minority and Women Owned Business Enterprises and Section 3 Firms to submit a bid. The Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents. Question Deadline 01/23/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Award

Water / Sewer

$500,000.00

Public - City

Site Work

26

22

18

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Bedroom Furnishings, Blankets, Pillows, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
147
Bidding Soon
1,871
All Active Projects
829
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

img_map_placeholder

33 George Thompson Rd, Mechanicville, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.