BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Daytona Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

General Conditions - Mobilization, Supervision, Survey Layout, Testing, Finalization, Temp traffic control, Temp fencing and site security Erosion and Pollution Control - Silt Fence, Inlet Erosion Control Protection, NDPES Monitoring Demolition - Mill Existing Asphalt, Remove Base, Demo Concrete Curbing, Water Line, 2 Power Poles and wire Paving, Base and Subbase - Temp Gravel Construction Entrance 15'x50', 6" Stabilized Base, 9" Built Up Base, 1 1/2" 12.5 ASCS Asphalt, 8" Reinforced Concrete Concrete & Curbing - Type F Curbing, 2' Environmental Curbing, 3'F Curb/Flat Curb transition, 6" Concrete Sidewalk 5' wide, ADA Detectable Warning Mats (Red), 3'x31'x8" Reinforced Turndown and wheel stops and Bollards Striping and Signage - 30" stop sign, Handicapped Parking Sign, No Parking Sign, Toll Attendant Parking Sign, Thermoplastic Striping and Imaging Water Distribution - 1" Water Service and Valves, and Shower Tower Landscaping and Irrigation - Plantings and Irrigation System w/Battery Operated 2 Zone Controller as shown on drawings, 6'x10'x24" #57 Stone Wrapped in Filter Fabric under 6" of sand and sod Question Submission Deadline:January 23, 2025, 11:59pm Term: Total contract time: 150 days A Bid bond shall accompany each Bid in an amount not less than five percent (5%) of the Bid amount and shall be valid for a period not less than one hundred twenty (120) days. No other forms will be accepted without prior approval from the County. Simultaneously with the delivery of the executed Contract to the County, a bidder to whom a Contract has been awarded must deliver to the County, executed, separate Payment and Performance Bond on the prescribed forms, each in an amount of one hundred percent (100%) of the Contract price of the accepted Bid proposal as security for the faithful performance of his Contract and for the payment of all persons performing labor or furnishing materials in connection therewith.

GC Bidding

Sidewalks / Parking Lot

$300,818.00

Public - County

Paving, Site Work

16

10

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
57
Bidding Soon
944
All Active Projects
352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

img_map_placeholder

University Blvd, Daytona Beach, FL


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.