BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2024 at 7:00 PM

Updated December 28, 2024

This is a service / maintenance or supply contract in La Vista, Nebraska. Contact the soliciting agency for additional information.

78th and Harrison Street Pump Station Comprehensive Engineering Review Evaluate, identify deficiencies and needed repairs, concerns, and provide improvement recommendations and estimated costs for the following: Civil / Exterior Pipes Driveway and parking area paving Site drainage Exterior vaults, valves, and valve actuators. This will include the actuated division valve in Harrison St. Exterior meter vault and meter Ralston Zone Pressure Reduction Valves Structural Pump Building structure Structural components supporting the pump building bridge crane Asbestos Evaluation the pump building for the presence of asbestos materials. Architectural Building Exterior, i.e. mortar joints and painted surfaces Holes and wall penetrations Roof Gutter and downspout Windows and louvers Entrance and overhead doors Plumbing Utility sinks and other plumbing fixtures Restroom fixtures, toilet, and stalls Mechanical Heaters and controls House air compressor Crane hoist and mechanical components Exhaust fans Pumps Pump performance - SCADA flow and pressure records suggest pumps #2 and #4 are performing below the original curves. What could explain this Motors / engines (condition and availability of replacement parts) Actuated discharge valves, manual isolation valves Instrumentation and Controls Improve local control user interface for manual operation at the station Water Quality instrumentation Suction, discharge, and flow transmitters and wiring Pump, motor, and engine monitoring Electrical Station transformer (condition and availability of replacement) Additional generation capacity for reliability and redundancy. Station service voltage (options for conversion to 480V/4160V) Switchgear MCC's Starters / VFD's wire/cable, raceways, conduits, and boxes Stand-by generator Interior lighting and switches, and receptacles. Panels Security Exterior lighting Fencing and gates Exterior and interior multi-sensor cameras Card access at entrance doors Alarm contacts on entrance and overhead doors Interior motion sensors Smoke and fire detection Alarm and monitoring integrations with Genetec software All questions shall be directed to the Project Engineer: Bob Taylor, P.E. Sr. Design Engineer - Water Operations Metropolitan Utilities District 3100 S. 61st Ave. Omaha, NE 68106 (402) 504-0455 bob_taylor@mudnebr.com Consultant Notice to Proceed 3-5-2025 The method of Contractor Selection has not been Determined at this time

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 5, 2025

Project location map

7761 Harrison St, La Vista, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.