BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated February 4, 2025

Site work for a water / sewer project in Duncan, Arizona. Completed plans call for site work for a water / sewer project.

Town of Duncan has been awarded a federal Community Development Block Grant (CDBG) from the State of Arizona Department of Housing (ADOH) and will accept sealed bids from licensed Arizona Contractors to complete the following improvements to the Town of Duncan's water system: Removal and replacement of the above-ground concrete containment slab with curbing and a return drain to the wet well. This provides for capture of raw wastewater released during normal preventative maintenance or repair work occurring within the manifold system. The modification will include re-use of the existing flow meter, placement of new valves (check & plug type), fittings, pipe spools, and pipe stands. The existing valve vault will be demoed in-place. The discharge force main will be excavated and a new connection to the force main and manifold will be installed. The scope of work also includes coating the wet well shaft and influent manholes with fiberglass liner systems to provide internal structural integrity, protect the system from groundwater intrusion and reduce demands on the pumps. Bidders are responsible for monitoring the website referenced above for notifications of changes and addenda related to this project. The Town of Duncan is seeking Colonias Set-Aside CDBG funds to make repairs to the wastewater lift station located at the terminus of CC Herrera Lane, Duncan Arizona 85534-8000. The scope of work will be to removal and replacement of the above-ground concrete containment slab with curbing and a return drain to the wet well. This provides for capture of raw wastewater released during normal preventative maintenance or repair work occurring within the manifold system. The modification will include re-use of the existing flow meter, placement of new valves (check & plug type), fittings, pipe spools, and pipe stands. The existing valve vault will be demoed in-place. The discharge force main will be excavated and a new connection to the force main and manifold will be installed. The scope of work also includes coating the wet well shaft and influent manholes with fiberglass liner systems to provide internal structural integrity, protect the system from groundwater intrusion and reduce demands on the pumps. See the proposal narrative and cost estimates on page 53 for a more detailed explanation. Town correspondence with ADEQ indicates these repairs will not require a permit from this agency (see page 48). The estimated life span of these repairs will be 20 years. The facility is on Town-owned property and all work is to take place within the existing footprint and housing for existing equipment inside the facility. No easements or other property acquisition is proposed. The property is reasonably accessible to persons with mobility issues, however, this facility is not open to the public and access is restricted. The contractor shall furnish all materials, labor, equipment, services, transportation and perform all the work for the Town's project known as COLONIAS WATER SYSTEM IMPROVEMENTS as called for in the plans/specifications. The proposer should prepare a detailed time schedule for completion. This is a Federally-funded project, and the successful proposer will be required to lend all possible assistance in the preparation, investigation and documentation necessary for compliance with all applicable federal Labor Standards/Davis-Bacon and other requirements of ADOH. The successful proposer should be prepared to comply with all local, state and federal safety and environmental requirements. The project shall be accomplished in accordance with all federal program and state statutory requirements to include 2 CFR 200, Executive Orders and the Arizona Administrative Code. Question Deadline 01/27/2025 at 1:00 PM MT date changed from 01/16/2025

Post-Bid

Water / Sewer

$529,241.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
50
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

February 19, 2025

Project location map

506 SE Old W Hwy, Duncan, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.