BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Site work and outdoor lighting for a playground / park / athletic field in Arnold, Missouri. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The Fox C-6 School District is seeking proposals to install an outdoor sports lighting system at Fox High School. The deadline for questions is scheduled for December 30th. Scope of Service and Performance Requirements The purpose of this Request for Proposal is to obtain proposals for an outdoor sports stadium lighting installation, as specified herein to complete a scope of work to include: SUMMARY A. Work covered by this section of the specifications shall conform to contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards for a turnkey LED lighting system. The manufacturer / contractor shall supply the lighting systems to meet or exceed the standards set forth in these specifications. C. This is a DESIGN/BUILD project requiring all engineering both structural and electrical to be provided by the bidder. No additional costs will be approved by the school. School reserves the right to accept or reject any bid. D. The lighting systems will be for the Football/Soccer stadium including the Track E. The primary goals of this lighting project are: 1. Guaranteed Light Levels: Selection of appropriate light levels impact the safety of the players and the enjoyment of spectators. Therefore, light levels are guaranteed to not drop below specified target values for a period of 10 years. 2. Environmental Light Control: Minimize spill light to adjoining properties and glare to the players, spectators and neighbors. 3. Life-cycle Cost: To reduce operating costs, the preferred lighting system shall be energy efficient and cost effective to operate. Accordingly, efficacy should be a minimum of 135 lumens/watt and no more than 48 kW of power shall be used for the entire site (football, soccer, & track) 4. Control and Monitoring: To reduce system and labor costs and allow for optimal operational flexibility of the lighting system, the customer requires a wireless control system. The system shall be capable of instant on/off control to reduce energy consumption. The system must permit multiple users with varying levels of access, and scheduling in advance based on both time and sunset/sundown.

Post-Bid

Playgrounds / Parks / Athletic Fields

$40,000.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
135
Bidding Soon
1,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2025

February 17, 2025

Project location map

751 Jeffco Blvd, Arnold, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.