Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2025 at 7:00 PM
Updated January 15, 2025
Site work and outdoor lighting for a playground / park / athletic field in Arnold, Missouri. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
The Fox C-6 School District is seeking proposals to install an outdoor sports lighting system at Fox High School. The deadline for questions is scheduled for December 30th. Scope of Service and Performance Requirements The purpose of this Request for Proposal is to obtain proposals for an outdoor sports stadium lighting installation, as specified herein to complete a scope of work to include: SUMMARY A. Work covered by this section of the specifications shall conform to contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards for a turnkey LED lighting system. The manufacturer / contractor shall supply the lighting systems to meet or exceed the standards set forth in these specifications. C. This is a DESIGN/BUILD project requiring all engineering both structural and electrical to be provided by the bidder. No additional costs will be approved by the school. School reserves the right to accept or reject any bid. D. The lighting systems will be for the Football/Soccer stadium including the Track E. The primary goals of this lighting project are: 1. Guaranteed Light Levels: Selection of appropriate light levels impact the safety of the players and the enjoyment of spectators. Therefore, light levels are guaranteed to not drop below specified target values for a period of 10 years. 2. Environmental Light Control: Minimize spill light to adjoining properties and glare to the players, spectators and neighbors. 3. Life-cycle Cost: To reduce operating costs, the preferred lighting system shall be energy efficient and cost effective to operate. Accordingly, efficacy should be a minimum of 135 lumens/watt and no more than 48 kW of power shall be used for the entire site (football, soccer, & track) 4. Control and Monitoring: To reduce system and labor costs and allow for optimal operational flexibility of the lighting system, the customer requires a wireless control system. The system shall be capable of instant on/off control to reduce energy consumption. The system must permit multiple users with varying levels of access, and scheduling in advance based on both time and sunset/sundown.
Post-Bid
Playgrounds / Parks / Athletic Fields
$40,000.00
Public - City
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2025
February 17, 2025
751 Jeffco Blvd, Arnold, MO
Related To This Project
Arnold, MO
Bid Date: Feb 12 2025
Arnold, MO
Bid Date: Jan 22 2025
Arnold, MO
--
Arnold, MO
Bid Date: May 07 2025
Arnold, MO
Bid Date: Apr 16 2025
Arnold, MO
--
Arnold, MO
Bid Date: May 07 2025
Arnold, MO
Bid Date: Jul 09 2025
Arnold, MO
Bid Date: Dec 02 2024
Arnold, MO
Bid Date: Nov 01 2024
Arnold, MO
Bid Date: Nov 15 2024
Arnold, MO
Bid Date: Oct 11 2024
Arnold, MO
Bid Date: Oct 17 2024
Arnold, MO
Bid Date: Aug 01 2024
Arnold, MO
Bid Date: Jul 25 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
