EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 29, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in North Ogden, Utah. Completed plans call for the renovation of a detention facility.

Description DFCM Division Facilities and Construction and Managment Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services Electrical system services including wiring and other electrical maintenance including HVAC construction and maintenance and installation and mechanical and machine installation and repair services Project Description: This project shall include the removal and replacement of the existing boiler and associated hydronic specialties, valves, electrical disconnects and all other associated items. It shall also include the removal and replacement for the existing expansion tank, air separator and heating water pumps. Construction Cost Estimate: $215,000.00 Question Deadline 01/14/2025 at 3:00 PM MT Online All questions are to be submitted through the Utah Public Procurement Place (U3P).

Post-Bid

Jails / Prisons

$215,000.00

Public - State/Provincial

Renovation

13

12

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
56
Bidding Soon
636
All Active Projects
265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

img_map_placeholder

1305 Depot Dr, North Ogden, UT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

DFCM Construction-Prequalified Mechanical - Ogden Weber Valley Youth Center Boiler Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.